MCWILLIAMS

Operating

Natural Gas power plant

Capacity
654 MW
Primary fuel
Natural Gas
County
Covington County
Operator
POWERSOUTH ENERGY COOPERATIVE
Status
Operating
Commissioned
1954
EIA plant ID
533
Generators
7
Technology
Natural Gas Fired Combined Cycle
Net generation (2024)
2,899 GWh
Capacity factor (2024, EIA nameplate)
50%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
31.4003, -86.4764

See it on the map

MCWILLIAMS, a 654 MW Natural Gas power plant in Covington County, Alabama. Operated by POWERSOUTH ENERGY COOPERATIVE, commissioned 1954.

How MCWILLIAMS compares

With 654 MW of capacity, MCWILLIAMS ranks 18th among the 64 operating power plants Bywatts maps in Alabama and 9th of the 16 operating Natural Gas plants in the state. It accounts for about 6.4% of Alabama's operating Natural Gas capacity and 2.1% of all operating capacity in the state. Nationally it is the 225th-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1954, it is older than 78% of the 64 operating Alabama plants with a recorded commissioning year. Its operator, POWERSOUTH ENERGY COOPERATIVE, runs 5 operating plants in Alabama totaling 1,984 MW. It shares Covington County with 2 other operating plants, POINT A and GANTT.

EIA-860 lists 7 generators at the site with 654 MW of nameplate capacity, all natural gas fired combined cycle technology. Net generation was 2,899 GWh in 2024 (a 50% capacity factor), down 26% from 2022. Its generators came online between 1954 and 2002.

Grid neighborhood

The closest transmission line found within 10 miles is a 115 kV line owned by ALABAMA POWER CO, under 0.1 miles away. Another 2 operating power plants totaling 8 MW sit within 25 miles; the largest is POINT A (5 MW, Hydro).

Computed by Bywatts from HIFLD power plant and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

MCWILLIAMS is a 654 MW natural gas power plant in Covington County, AL, operated by POWERSOUTH ENERGY COOPERATIVE, commissioned in 1954. Covington County carries critical modeled catastrophe exposure in the FEMA National Risk Index, scoring 4.2 of 5 at the 81st national percentile. Hurricane is the leading peril, rated Relatively High by FEMA at the 97th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

4.2 of 5Modeled catastrophe exposure
CriticalExposure band
HurricaneLeading peril
Relatively ModerateFEMA county risk rating

Covington County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HurricaneRelatively High97th4.9 of 50.18
Riverine floodingRelatively Low77th4.1 of 50.61
LightningRelatively High73rd3.9 of 575.2
TornadoRelatively Moderate70th3.8 of 50.94
WildfireVery Low50th3.0 of 5<0.01
EarthquakeVery Low43rd2.7 of 5<0.01
Strong windRelatively Low38th2.5 of 52.1
Heat waveRelatively Low37th2.5 of 57.3
Ice stormRelatively Low35th2.4 of 50.12
Winter weatherRelatively Low29th2.2 of 50.74
HailVery Low13th1.5 of 51.4

Perils not assessed in Covington County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Covington County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.