CAMINO

Operating

Hydro power plant

Capacity
158 MW
Primary fuel
Hydro
County
El Dorado County
Operator
SACRAMENTO MUNICIPAL UTIL DIST
Status
Operating
Commissioned
1963
EIA plant ID
430
Generators
2
Technology
Conventional Hydroelectric
Net generation (2024)
268 GWh
Capacity factor (2024, EIA nameplate)
19%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
38.8288, -120.5371

See it on the map

CAMINO, a 158 MW Hydro power plant in El Dorado County, California. Operated by SACRAMENTO MUNICIPAL UTIL DIST, commissioned 1963.

How CAMINO compares

With 158 MW of capacity, CAMINO ranks 97th among the 874 operating power plants Bywatts maps in California and 21st of the 195 operating Hydro plants in the state. It accounts for about 1.2% of California's operating Hydro capacity and 0.2% of all operating capacity in the state. Nationally it is the 116th-largest of the 1,243 operating Hydro plants in the database. Commissioned in 1963, it is older than 88% of the 859 operating California plants with a recorded commissioning year. Its operator, SACRAMENTO MUNICIPAL UTIL DIST, runs 14 operating plants in California totaling 2,070 MW. It shares El Dorado County with 8 other operating plants, including WHITE ROCK/SLAB CREEK and JAYBIRD.

EIA-860 lists 2 generators at the site with 158 MW of nameplate capacity, all conventional hydroelectric technology. Net generation was 268 GWh in 2024 (a 19% capacity factor), up 27% from 2022. Its generators came online between 1963 and 1968.

Grid neighborhood

The nearest named substation is JAYBIRD (230 kV), about 0.5 miles away; the closest transmission line found within 10 miles is a 230 kV line owned by PACIFIC GAS & ELECTRIC COMPANY, about 0.3 miles away. Another 12 operating power plants totaling 836 MW sit within 25 miles; the largest is WHITE ROCK/SLAB CREEK (266 MW, Hydro).

Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

CAMINO is a 158 MW hydro power plant in El Dorado County, CA, operated by SACRAMENTO MUNICIPAL UTIL DIST, commissioned in 1963. El Dorado County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.5 of 5 at the 14th national percentile. Wildfire is the leading peril, rated Relatively High by FEMA at the 98th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a hydro plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.5 of 5Modeled catastrophe exposure
LowExposure band
WildfireLeading peril
Relatively ModerateFEMA county risk rating

El Dorado County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
WildfireRelatively High98th4.9 of 50.01
EarthquakeRelatively Moderate86th4.4 of 50.02
Riverine floodingRelatively Moderate77th4.1 of 51.1
Heat waveRelatively Low61st3.4 of 54.4
TornadoVery Low6th1.2 of 50.15
Strong windRelatively Low4th1.1 of 50.07
Winter weatherRelatively High3rd1.1 of 528.5
LightningRelatively Moderate3rd1.1 of 514.4
HailVery Low1st1.0 of 50.16

Perils not assessed in El Dorado County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
HurricaneFEMA rating is "Not Applicable" for this county
Coastal floodingFEMA rating is "Not Applicable" for this county
Ice stormFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for El Dorado County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.