Natural Gas Power Plants in California
California has 238 natural gas power plants in the Bywatts database, 48 of them retired and 3 partly retired according to EIA-860. Together they total 46.3 GW of nameplate capacity, 36.8 GW of it at operating plants. The largest operating plant is DYNEGY MOSS LANDING POWER PLANT (2,802 MW), operated by DYNEGY -MOSS LANDING LLC.
238Plants
46.3 GWCombined capacity
All 238 natural gas plants in California
| Plant | Capacity (MW) | Operator | Commissioned |
|---|---|---|---|
| DYNEGY MOSS LANDING POWER PLANT | 2,802 | DYNEGY -MOSS LANDING LLC | 2002 |
| AES ALAMITOS LLC | 1,997 | AES ALAMITOS LLC | 1961 |
| HAYNES | 1,619 | LOS ANGELES DEPARTMENT OF WATER & POWER | 1962 |
| ORMOND BEACH | 1,612 | NRG CALIFORNIA SOUTH LP | 1971 |
| AES REDONDO BEACH LLC Retired 2023 | 1,334 | AES REDONDO BEACH LLC | · |
| PITTSBURG POWER Retired 2017 | 1,311 | NRG DELTA LLC | · |
| LA PALOMA GENERATING LLC | 1,200 | LA PALOMA GENERATING CO LLC | 2003 |
| DYNEGY MORRO BAY LLC Retired 2014 | 1,056 | DYNEGY MORRO BAY LLC | · |
| MOUNTAINVIEW GENERATING STATION | 1,018 | SOUTHERN CALIFORNIA EDISON CO | 2005 |
| ENCINA Retired 2018 | 1,000 | NRG CABRILLO POWER OPS INC | · |
| DELTA ENERGY CENTER | 944 | DELTA ENERGY CENTER LLC | 2002 |
| HIGH DESERT POWER PLANT | 852 | HIGH DESERT POWER PROJECT LLC | 2003 |
| SCATTERGOOD | 843 | LOS ANGELES DEPARTMENT OF WATER & POWER | 1958 |
| MARSH LANDING GENERATING STATION | 828 | NRG MARSH LANDING LLC | 2013 |
| INLAND EMPIRE ENERGY CENTER Retired 2020 | 819 | INLAND EMPIRE ENERGY CTR LLC | · |
| CPV SENTINEL ENERGY PROJECT | 800 | CPV SENTINEL LLC | 2013 |
| PASTORIA ENERGY FACILITY LLC | 750 | CALPINE CORP - PASTORIA ENERGY CENTER | 2005 |
| COOLWATER Retired 2014 | 727 | NRG CALIFORNIA SOUTH LP | · |
| COLUSA GENERATING STATION | 712 | PACIFIC GAS & ELECTRIC CO | 2010 |
| OTAY MESA GENERATING PROJECT | 689 | OTAY MESA ENERGY CENTER LLC | 2009 |
| LOS MEDANOS ENERGY CENTER | 678 | LOS MEDANOS ENERGY CENTER LLC | 2001 |
| RUSSELL CITY ENERGY CENTER | 655 | RUSSELL CITY ENERGY COMPANY LLC | 2013 |
| EL SEGUNDO POWER Retired 2015 | 654 | NRG EL SEGUNDO OPERATIONS INC | · |
| ETIWANDA GENERATING STATION Retired 2018 | 640 | NRG CALIFORNIA SOUTH LP | · |
| SUTTER ENERGY CENTER | 636 | CALPINE CORP-SUTTER | 2001 |
| METCALF ENERGY CENTER | 635 | CALPINE CORP - METCALF ENERGY CENTER | 2005 |
| ELK HILLS POWER LLC | 623 | ELK HILLS POWER LLC | 2003 |
| GATEWAY GENERATING STATION | 620 | PACIFIC GAS & ELECTRIC CO | 2009 |
| SUNRISE POWER LLC | 605 | SUNRISE POWER CO LLC | 2001 |
| BLYTHE ENERGY INC | 591 | ALTAGAS BLYTHE OPERATIONS INC | 2003 |
| AES HUNTINGTON BEACH LLC Partly retired | 585 | AES HUNTINGTON BEACH LLC | 1958 |
| VALLEY (CA) | 576 | LOS ANGELES DEPARTMENT OF WATER & POWER | 2001 |
| MANDALAY Retired 2018 | 574 | NRG CALIFORNIA SOUTH LP | · |
| EL SEGUNDO ENERGY CENTER LLC | 537 | NRG EL SEGUNDO OPERATIONS INC | 2013 |
| COSUMNES | 530 | SACRAMENTO MUNICIPAL UTIL DIST | 2006 |
| WALNUT CREEK ENERGY PARK | 500 | EDISON MISSION ENERGY | 2013 |
| HARBOR | 468 | LOS ANGELES DEPARTMENT OF WATER & POWER | 1995 |
| PANOCHE ENERGY CENTER | 432 | PANOCHE ENERGY CENTER LLC | 2009 |
| WATSON COGENERATION | 398 | ARCO PRODUCTS CO-WATSON | 1987 |
| MAGNOLIA POWER PROJECT | 388 | CITY OF BURBANK WATER AND POWER | 2005 |
| TRACY COMBINED CYCLE POWER PLANT | 342 | GWF ENERGY LLC | 2003 |
| EL CENTRO | 340 | IMPERIAL IRRIGATION DISTRICT | 1952 |
| LONG BEACH GENERATION LLC | 335 | NRG EL SEGUNDO OPERATIONS INC | 1976 |
| SYCAMORE COGENERATION | 312 | SYCAMORE COGENERATION CO | 1987 |
| KERN RIVER COGENERATION | 308 | KERN RIVER COGENERATION CO | 1985 |
| LOS ESTEROS CRITICAL ENERGY CENTER | 306 | LOS ESTEROS CRITICAL ENERGY FACILITY LLC | 2003 |
| WALNUT ENERGY CENTER | 301 | TURLOCK IRRIGATION DISTRICT | 2006 |
| GRAYSON Partly retired | 264 | CITY OF GLENDALE - (CA) | 2004 |
| MIDWAY SUNSET COGEN | 249 | MIDWAY-SUNSET COGENERATION CO | 1989 |
| CROCKETT COGEN PROJECT | 247 | CROCKETT COGENERATION | 1995 |
| ALMOND POWER PLANT | 224 | TURLOCK IRRIGATION DISTRICT | 1996 |
| MARIPOSA ENERGY PROJECT | 200 | DIAMOND GENERATING CORPORATION | 2012 |
| WOODLAND | 199 | MODESTO IRRIGATION DISTRICT | 1993 |
| SCA COGEN 2 | 193 | SACRAMENTO MUNICIPAL UTIL DIST | 1997 |
| REDDING POWER | 186 | CITY OF REDDING - (CA) | 1989 |
| SPA COGEN 3 | 174 | SACRAMENTO MUNICIPAL UTIL DIST | 1997 |
| ROSEVILLE ENERGY PARK | 164 | CITY OF ROSEVILLE - (CA) | 2007 |
| HUMBOLDT BAY | 163 | PACIFIC GAS & ELECTRIC CO | 2010 |
| MALBURG | 159 | COLORADO ENERGY MANAGEMENT LLC | 2005 |
| DONALD VON RAESFELD POWER PLANT | 154 | CITY OF SANTA CLARA - (CA) | 2005 |
| GLENARM | 152 | CITY OF PASADENA - (CA) | 1976 |
| INDIGO ENERGY FACILITY | 150 | DIAMOND GENERATING CORPORATION | 2001 |
| MIDWAY PEAKING LLC | 140 | MIDWAY PEAKING LLC | 2009 |
| GILROY PEAKING ENERGY CENTER | 135 | CALPINE GILROY COGEN LP | 2001 |
| KING CITY POWER PLANT | 133 | CALPINE KING CITY COGEN LLC | 1989 |
| GILROY POWER PLANT | 130 | CALPINE GILROY COGEN LP | 1987 |
| CARSON ICE-GEN PROJECT | 126 | SACRAMENTO MUNICIPAL UTIL DIST | 1995 |
| EL SEGUNDO COGEN | 126 | CHEVRON USA INC-EL SEQUNDO | 1987 |
| NILAND GAS TURBINE PLANT | 121 | IMPERIAL IRRIGATION DISTRICT | 2008 |
| RIPON GENERATION STATION | 121 | MODESTO IRRIGATION DISTRICT | 2006 |
| FOSTER WHEELER MARTINEZ | 114 | FOSTER WHEELER POWER SYS INC | 1987 |
| HARBOR COGEN | 107 | HARBOR COGENERATION CO. | 1988 |
| MARTINEZ REFINING | 104 | MARTINEZ REFINING CO | 1995 |
| RICHMOND COGEN | 104 | CHEVRON PRODUCTS COMPANY-RICHMOND | 1992 |
| LARKSPUR ENERGY FACILITY | 100 | DIAMOND GENERATING CORPORATION | 2001 |
| OLIVE | 99 | CITY OF BURBANK WATER AND POWER | 1959 |
| HENRIETTA PEAKER | 98 | GWF ENERGY LLC | 2002 |
| HANFORD ENERGY PARK PEAKER | 97 | GWF ENERGY LLC | 2001 |
| SOUTH BELRIDGE COGENERATION FACILITY | 94 | AERA ENERGY LLC | 1985 |
| BROADWAY (CA) Retired 2016 | 92 | CITY OF PASADENA - (CA) | · |
| COACHELLA | 92 | IMPERIAL IRRIGATION DISTRICT | 1973 |
| FRESNO COGEN PARTNERS | 79 | WELLHEAD SERVICES INC | 2001 |
| MCCLELLAN (CA) | 77 | SACRAMENTO MUNICIPAL UTIL DIST | 1986 |
| CES PLACERITA POWER PLANT | 75 | CES PLACERITA INC | 1988 |
| OXNARD | 71 | PROCTER&GAMBLE PAPER PRODUCTS CO-OXNARD | 1982 |
| LOS ANGELES REFINERY WILMINGTON | 69 | PHILLIPS 66 - LOS ANGELES | 1988 |
| GREENLEAF 1 POWER PLANT | 66 | CALPINE CORP-YUBA CITY | 2022 |
| GIANERA | 65 | CITY OF SANTA CLARA - (CA) | 1986 |
| ALGONQUIN POWER SANGER LLC | 62 | ALGONQUIN POWER SANGER LLC | 2007 |
| AGUA MANSA POWER PLANT | 61 | E I COLTON LLC | 2003 |
| LAKE ONE | 61 | CITY OF BURBANK WATER AND POWER | 2002 |
| ELLWOOD | 58 | NRG CALIFORNIA SOUTH LP | 1974 |
| MOJAVE COGEN Retired 2014 | 58 | ENERGY OPERATION GROUP | · |
| CALPEAK POWER PANOCHE PEAKER PLANT | 57 | CALPEAK POWER - PANOCHE LLC | 2001 |
| CALPEAK POWER VACA DIXON PEAKER PLANT | 57 | CALPEAK POWER - VACA DIXON LLC | 2002 |
| THUMS | 57 | THUMS LONG BEACH COMPANY | 2003 |
| CARSON COGENERATION | 56 | CARSON COGENERATION CO | 1989 |
| ALAMEDA | 55 | NORTHERN CALIFORNIA POWER AGNY | 1986 |
| NAVAL STATION ENERGY FACILITY Retired 2018 | 55 | APPLIED ENERGY INC | · |
| ROSEVILLE | 55 | CITY OF ROSEVILLE - (CA) | 1986 |
| CARDINAL COGEN Retired 2015 | 53 | CARDINAL COGEN INC | · |
| CALPEAK POWER BORDER PEAKER PLANT | 52 | CALPEAK POWER - BORDER LLC | 2001 |
| CALPEAK POWER ENTERPRISE PEAKER PLANT | 52 | CALPEAK POWER - ENTERPRISE LLC | 2001 |
| GOAL LINE LP | 51 | GOAL LINE LP | 1994 |
| VALERO REFINERY COGENERATION UNIT 1 | 51 | VALERO REFINING CO CALIFORNIA | 2002 |
| BARRE PEAKER | 50 | SOUTHERN CALIFORNIA EDISON CO | 2007 |
| CENTER PEAKER | 50 | SOUTHERN CALIFORNIA EDISON CO | 2007 |
| CHOWCHILLA II | 50 | CALIFORNIA POWER HOLDINGS LLC | 2001 |
| COMBUSTION TURBINE PROJECT NO 2 | 50 | NORTHERN CALIFORNIA POWER AGNY | 1996 |
| DOUBLE C | 50 | JUNIPER GENERATION LLC | 1989 |
| EL CAJON ENERGY CENTER | 50 | EL CAJON ENERGY LLC | 2010 |
| GRAPELAND PEAKER | 50 | SOUTHERN CALIFORNIA EDISON CO | 2007 |
| GREENLEAF 2 POWER PLANT | 50 | CALPINE CORP-YUBA CITY | 1989 |
| HIGH SIERRA | 50 | JUNIPER GENERATION LLC | 1989 |
| KERN FRONT | 50 | JUNIPER GENERATION LLC | 1989 |
| MCGRATH PEAKER | 50 | SOUTHERN CALIFORNIA EDISON CO | 2012 |
| MIRA LOMA PEAKER | 50 | SOUTHERN CALIFORNIA EDISON CO | 2007 |
| PANOCHE PEAKER | 50 | WELLHEAD SERVICES INC | 1973 |
| RIPON MILL | 50 | RIPON COGENERATION LLC | 1988 |
| ROCKWOOD | 50 | IMPERIAL IRRIGATION DISTRICT | 1979 |
| WALNUT | 50 | TURLOCK IRRIGATION DISTRICT | 1986 |
| ANAHEIM GT Retired 2019 | 49 | CITY OF ANAHEIM - (CA) | · |
| CLEARWATER POWER PLANT | 49 | CITY OF RIVERSIDE - (CA) | 2005 |
| CUYAMACA PEAK ENERGY PLANT | 49 | SAN DIEGO GAS & ELECTRIC CO | 2002 |
| E F OXNARD ENERGY FACILITY | 49 | EF OXNARD LLC | 1990 |
| EXXONMOBIL SANTA YNEZ FACILITY | 49 | EXXON MOBIL PRODUCTION CO | 1993 |
| KERN RIVER EASTRIDGE COGEN | 49 | CHEVRON USA INC | 1988 |
| MIRAMAR Retired 2016 | 49 | NRG CABRILLO POWER OPS INC | · |
| WELLHEAD POWER DELANO LLC | 49 | WELLHEAD SERVICES INC | 2013 |
| YUBA CITY COGEN PARTNERS | 49 | WELLHEAD SERVICES INC | 1990 |
| BADGER CREEK COGEN | 48 | JUNIPER GENERATION LLC | 1991 |
| BEAR MOUNTAIN COGEN | 48 | JUNIPER GENERATION LLC | 1995 |
| CHALK CLIFF COGEN | 48 | JUNIPER GENERATION LLC | 1990 |
| ELK HILLS COGEN | 48 | OCCIDENTAL OF ELK HILLS INC | 1994 |
| LIVE OAK COGEN | 48 | JUNIPER GENERATION LLC | 1992 |
| MCKITTRICK COGEN FACILITY | 48 | JUNIPER GENERATION LLC | 1991 |
| SAN JOAQUIN COGEN Retired 2016 | 48 | SAN JOAQUIN LLC | · |
| US BORAX | 48 | U S BORAX INC | 1984 |
| CORONA COGEN Retired 2017 | 47 | JUNIPER GENERATION LLC | · |
| CREED ENERGY CENTER | 47 | CREED ENERGY CENTER LLC | 2003 |
| FEATHER RIVER ENERGY CENTER | 47 | CALPINE CORP-YUBA CITY | 2003 |
| GOOSE HAVEN ENERGY CENTER | 47 | GOOSE HAVEN ENERGY CENTER | 2003 |
| KING CITY PEAKING | 47 | CALPINE CORP-KING CITY | 2002 |
| LAMBIE ENERGY CENTER | 47 | GILROY ENERGY CENTER LLC | 2003 |
| RIVERVIEW ENERGY CENTER | 47 | GILROY ENERGY CENTER FOR RIVERVIEW | 2003 |
| WOLFSKILL ENERGY CENTER | 47 | GILROY ENERGY CENTER LLC | 2003 |
| YUBA CITY ENERGY CENTER | 47 | CALPINE CORP-YUBA CITY | 2002 |
| SAN GABRIEL FACILITY | 46 | RIPON COGENERATION LLC | 2016 |
| CHULA VISTA I | 44 | WELLHEAD SERVICES INC | 2001 |
| UCLA SO CAMPUS COGEN PROJECT | 43 | UNIVERSITY OF CALIFORNIA-LA | 1993 |
| NORTH ISLAND ENERGY FACILITY Retired 2018 | 42 | APPLIED ENERGY INC | · |
| OILDALE ENERGY LLC Retired 2016 | 42 | OILDALE ENERGY LLC | · |
| BERRY COGEN | 39 | BERRY PETROLEUM CO | 1986 |
| MID-SET COGENERATION | 39 | MID SET COGENERATION CO | 1989 |
| SALINAS RIVER COGENERATION | 39 | SALINAS RIVER COGENERATION CO | 1991 |
| COALINGA COGENERATION | 38 | COALINGA COGENERATION CO | 1991 |
| SARGENT CANYON COGENERATION | 38 | SARGENT CANYON COGENERATION CO | 1991 |
| KINGSBURG COGEN | 36 | KES KINGSBURG LP | 1990 |
| WESTERN POWER & STEAM INC | 36 | WESTERN POWER & STEAM INC | 1990 |
| NEW-INDY ONTARIO MILL | 34 | NEW-INDY ONTARIO LLC | 2019 |
| UNIVERSITY OF CALIFORNIA SAN DIEGO | 33 | UNIVERSITY OF CALIFORNIA SAN DIEGO | 2001 |
| AGNEWS POWER PLANT | 32 | OLS ENERGY-AGNEWS INC. | 1990 |
| OLS ENERGY CAMARILLO | 31 | CSUCI SITE AUTHORITY | 1988 |
| OLS ENERGY CHINO | 31 | OLS ENERGY-CHINO | 1987 |
| SOUTHEAST KERN RIVER COGEN | 31 | CHEVRON USA INC | 1989 |
| WHEELABRATOR NORWALK ENERGY Retired 2018 | 31 | WHEELABRATOR ENVIRONMENTAL SYSTEMS | · |
| OXNARD PAPER MILL | 29 | NEW-INDY OXNARD LLC | 1986 |
| PE BERKELEY | 29 | DELTA POWER SERVICES | 1987 |
| C P KELCO SAN DIEGO PLANT | 28 | CPKELCO U S INC | 1983 |
| PITCHESS COGEN STATION Retired 2018 | 28 | LOS ANGELES COUNTY | · |
| JEFFERSON SMURFIT SANTA CLARA MILL Retired 2017 | 27 | GRAPHIC PACKAGING INTERNATIONAL INC | · |
| LODI | 27 | NORTHERN CALIFORNIA POWER AGNY | 1986 |
| NTC/MCRD ENERGY FACILITY Retired 2018 | 26 | APPLIED ENERGY INC | · |
| FULLERTON MILL CHP Retired 2020 | 21 | KIMBERLY-CLARK WORLDWIDE INC | · |
| WESTEND FACILITY | 20 | SEARLES VALLEY MINERALS OPERATIONS INC. | 1969 |
| UCI FACILITIES MANAGEMENT CENTRAL PLANT | 19 | UNIVERSITY OF CALIFORNIA IRVINE | 2007 |
| BERRY COGEN TANNE HILLS 18 | 18 | BERRY PETROLEUM CO | 1986 |
| EL CAJON Retired 2016 | 18 | NRG CABRILLO POWER OPS INC | · |
| COALINGA 25D COGEN | 14 | CHEVRON USA INC | 1986 |
| GAVIOTA OIL PLANT Retired 2020 | 14 | FREEPORT MCMORAN OIL & GAS | · |
| PARNASSUS CENTRAL UTILITY PLANT | 14 | UNIVERSITY OF CALIFORNIA-SAN FRANCISCO | 1996 |
| SAN DIEGO STATE UNIVERSITY | 14 | SAN DIEGO STATE UNIVERSITY | 2002 |
| HOUWELING NURSERIES | 13 | HOUWELING'S TOMATOES | 2012 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | 12 | CALIFORNIA INSTITUTE-TECHNOLGY | 2003 |
| CYMRIC 36W COGEN | 12 | CHEVRON USA INC | 1982 |
| H. GONZALES | 12 | CITY OF VERNON | 1987 |
| TAFT 26C COGEN | 12 | CHEVRON USA INC | 1982 |
| LOST HILLS COGENERATION PLANT | 11 | AERA ENERGY LLC | 1985 |
| MCKITTRICK COGEN | 11 | CHEVRON USA INC | 2012 |
| NORTH MIDWAY COGEN | 11 | CHEVRON USA INC | 1986 |
| AERA SOUTH BELRIDGE COGEN FACILITY Retired 2010 | 9 | AERA ENERGY LLC | · |
| CENTRAL UTILITIES PLANT LAX 2 | 9 | LAX AIRPORT | 2015 |
| MCAGCC COGEN PLANT 2 | 9 | DOD USMC MARINE AIR GROUND COMBAT | · |
| SANTA MARIA COGEN PLANT Retired 2014 | 9 | WELLHEAD SERVICES INC | · |
| SPRECKELS SUGAR COMPANY | 9 | SPRECKELS SUGAR COMPANY | 1948 |
| KERN RIVER FEE C COGEN Retired 2011 | 8 | CHEVRON USA INC | · |
| INGREDION STOCKTON Retired 2018 | 7 | INGREDION INC - STOCKTON | · |
| KERN RIVER FEE A COGEN Retired 2011 | 7 | CHEVRON USA INC | · |
| MCAGCC COGEN PLANT 1 | 7 | DOD USMC MARINE AIR GROUND COMBAT | 2003 |
| PARAMOUNT REFINERY Retired 2022 | 7 | PARAMOUNT PETROLEUM CORPORATION | · |
| FRITO-LAY COGEN PLANT Retired 2021 | 6 | FRITO-LAY INC | · |
| SAN JOSE COGENERATION | 6 | SAN JOSE STATE UNIVERSITY FCLTS DEV &OPS | 1984 |
| SRI INTERNATIONAL COGEN PROJECT | 6 | IPT SRI COGENERATION INC | 1987 |
| GENERAL MILLS OPERATIONS LODI Retired 2015 | 5 | GENERAL MILLS OPERATIONS INC | · |
| KERN OIL & REFINING CO | 5 | KERN OIL & REFINING CO | 2002 |
| RHODIA DOMINGUEZ PLANT | 5 | RHODIA INC | 1976 |
| SAINT AGNES MEDICAL CENTER | 5 | SAINT AGNES MEDICAL CENTER | 2001 |
| WELPORT LEASE PROJECT | 5 | FREEPORT MCMORAN OIL & GAS | 1990 |
| CCCSD WASTEWATER TREATMENT PLNT | 4 | CENTRAL CONTRA COSTA SANITARY DISTRICT | 1995 |
| KAWEAH DELTA DISTRICT HOSPITAL | 4 | KAWEAH DELTA HOSPITAL | 2008 |
| KERN RIVER FEE B COGEN Retired 2011 | 4 | CHEVRON USA INC | · |
| NAVAL HOSPITAL MEDICAL CENTER | 4 | DEPARTMENT OF THE NAVY | 2003 |
| UNIV OF CALIF SANTA CRUZ COGENERATION | 4 | SANTA CRUZ COGENERATION ASSOC | 2013 |
| UNION TRIBUNE PUBLISHING Retired 2016 | 3 | UNION TRIBUNE LLC | · |
| ENERGY CENTER Partly retired | 2 | UNIVERSITY OF REDLANDS | 2019 |
| UNIV OF SAN FRANCISCO COGEN | 2 | UNIVERSITY OF SAN FRANCISCO | 1987 |
| CALIFORNIA STATE UNIVERSITY SAN BERNARDI Retired 2023 | 1 | SOUTHERN CALIFORNIA EDISON CO | · |
| COCA COLA AMERICAN CANYON Retired 2020 | 1 | BLOOM ENERGY 2009 PPA | · |
| CSU EAST BAY Retired 2021 | 1 | PACIFIC GAS & ELECTRIC CO | · |
| FRANKLIN TEMPLETON SAN MATEO | 1 | BLOOM ENERGY | 2011 |
| HONDA TORRANCE Retired 2023 | 1 | BLOOM ENERGY | · |
| JUNIPER NETWORKS SUNNYVALE Retired 2024 | 1 | BLOOM ENERGY | · |
| KELLOGG'S - SAN JOSE | 1 | BLOOM ENERGY | 2013 |
| LIFE TECHNOLOGIES - PLEASANTON | 1 | BLOOM ENERGY | 2013 |
| LIFE TECHNOLOGIES CARLSBAD | 1 | BLOOM ENERGY | 2012 |
| LOCKHEED MARTIN SUNNYVALE Retired 2022 | 1 | BLOOM ENERGY | · |
| ROLL DELANO | 1 | BLOOM ENERGY | 2012 |
| ROLL DELANO 2 Retired 2023 | 1 | BLOOM ENERGY | · |
| ROLL LOST HILLS Retired 2023 | 1 | BLOOM ENERGY | · |
| SAINT JOHNS HEALTH CENTER | 1 | SAINT JOHN'S HEALTH CENTER | 1992 |
| SONOMA COUNTY FUEL CELL Retired 2020 | 1 | THE COUNTY OF SONOMA | · |
| TAYLOR FARMS SALINAS | 1 | BLOOM ENERGY | · |
| THOMAS M KNOTT COGEN FACILITY | 1 | FREEPORT MCMORAN OIL & GAS | 2003 |
| VERIZON-TORRANCE Retired 2023 | 1 | BLOOM ENERGY | · |
| XILINX SAN JOSE | 1 | BLOOM ENERGY | 2018 |
| KEARNY Retired 2017 | · | NRG CABRILLO POWER OPS INC | · |
| KEARNY Retired 2017 | · | NRG CABRILLO POWER OPS INC | · |
| LODI ENERGY CENTER | · | NORTHERN CALIFORNIA POWER AGNY | 2012 |