PIT 6

Operating

Hydro power plant

Capacity
80 MW
Primary fuel
Hydro
County
Shasta County
Operator
PACIFIC GAS & ELECTRIC CO
Status
Operating
Commissioned
1965
EIA plant ID
269
Generators
2
Technology
Conventional Hydroelectric
Net generation (2024)
242 GWh
Capacity factor (2024, EIA nameplate)
35%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
40.9226, -121.9929

See it on the map

PIT 6, an 80 MW Hydro power plant in Shasta County, California. Operated by PACIFIC GAS & ELECTRIC CO, commissioned 1965.

How PIT 6 compares

With 80 MW of capacity, PIT 6 ranks 187th among the 874 operating power plants Bywatts maps in California and 46th of the 195 operating Hydro plants in the state. It accounts for about 0.6% of California's operating Hydro capacity and 0.1% of all operating capacity in the state. Nationally it is the 211th-largest of the 1,243 operating Hydro plants in the database. Commissioned in 1965, it is older than 87% of the 859 operating California plants with a recorded commissioning year. Its operator, PACIFIC GAS & ELECTRIC CO, runs 71 operating plants in California totaling 7,904 MW. It shares Shasta County with 32 other operating plants, including SHASTA and REDDING POWER.

EIA-860 lists 2 generators at the site with 79 MW of nameplate capacity, all conventional hydroelectric technology. Net generation was 242 GWh in 2024 (a 35% capacity factor), up 42% from 2022.

Grid neighborhood

The nearest named substation is PIT 6 (230 kV), under 0.1 miles away; the closest transmission line found within 10 miles is a 230 kV line, under 0.1 miles away. Another 18 operating power plants totaling 830 MW sit within 25 miles; the largest is JAMES B BLACK (172 MW, Hydro).

Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

PIT 6 is an 80 MW hydro power plant in Shasta County, CA, operated by PACIFIC GAS & ELECTRIC CO, commissioned in 1965. Shasta County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.8 of 5 at the 20th national percentile. Wildfire is the leading peril, rated Relatively High by FEMA at the 98th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a hydro plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.8 of 5Modeled catastrophe exposure
LowExposure band
WildfireLeading peril
Relatively ModerateFEMA county risk rating

Shasta County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
WildfireRelatively High98th4.9 of 5<0.01
EarthquakeRelatively Moderate94th4.7 of 50.02
Riverine floodingRelatively High93rd4.7 of 51.0
Heat waveRelatively Moderate68th3.7 of 55.0
LightningRelatively Moderate9th1.3 of 514.2
TornadoVery Low7th1.3 of 50.07
HailVery Low3rd1.1 of 50.10
Winter weatherRelatively Moderate2nd1.1 of 520.9
Strong windVery Low1st1.0 of 50.02

Perils not assessed in Shasta County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
HurricaneFEMA rating is "Not Applicable" for this county
Coastal floodingFEMA rating is "Not Applicable" for this county
Ice stormFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Shasta County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.