HARDEE POWER STATION

Operating

Natural Gas power plant

Capacity
432 MW
Primary fuel
Natural Gas
County
Hardee County
Operator
INVENERGY SERVICES LLC
Status
Operating
Commissioned
1993
EIA plant ID
50949
Generators
5
Technology
Natural Gas Fired Combined Cycle
Net generation (2024)
946 GWh
Capacity factor (2024, EIA nameplate)
23%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
27.6367, -81.9637

See it on the map

HARDEE POWER STATION, a 432 MW Natural Gas power plant in Hardee County, Florida. Operated by INVENERGY SERVICES LLC, commissioned 1993.

How HARDEE POWER STATION compares

With 432 MW of capacity, HARDEE POWER STATION ranks 37th among the 110 operating power plants Bywatts maps in Florida and 26th of the 55 operating Natural Gas plants in the state. It accounts for about 1.0% of Florida's operating Natural Gas capacity and 0.7% of all operating capacity in the state. Nationally it is the 358th-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1993, it is newer than 50% of the 108 operating Florida plants with a recorded commissioning year. It shares Hardee County with 2 other operating plants, MIDULLA GENERATING STATION and VANDOLAH POWER STATION.

EIA-860 lists 5 generators at the site with 470 MW of nameplate capacity, mainly natural gas fired combined cycle technology. Net generation was 946 GWh in 2024 (a 23% capacity factor), down 14% from 2022. Its generators came online between 1993 and 2000.

Grid neighborhood

The closest transmission line found within 10 miles is a 230 kV line owned by DUKE ENERGY FLORIDA, LLC, under 0.1 miles away. Another 12 operating power plants totaling 8,667 MW sit within 25 miles; the largest is MANATEE (2,951 MW, Natural Gas). Within 50 miles are 3 mapped data centers; the nearest is WOW! Business (Tampa Datacenter) in Tampa, about 37.1 miles away.

Computed by Bywatts from HIFLD power plant and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

HARDEE POWER STATION is a 432 MW natural gas power plant in Hardee County, FL, operated by INVENERGY SERVICES LLC, commissioned in 1993. Hardee County carries critical modeled catastrophe exposure in the FEMA National Risk Index, scoring 4.6 of 5 at the 89th national percentile. Strong wind is the leading peril, rated Very High by FEMA at the 100th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

4.6 of 5Modeled catastrophe exposure
CriticalExposure band
Strong windLeading peril
Relatively LowFEMA county risk rating

Hardee County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Strong windVery High100th5.0 of 50.76
HurricaneRelatively Moderate95th4.8 of 50.24
WildfireRelatively Low88th4.5 of 5<0.01
LightningRelatively Moderate73rd3.9 of 597.4
TornadoRelatively Low53rd3.1 of 50.65
Riverine floodingVery Low24th2.0 of 50.79
Heat waveVery Low22nd1.9 of 53.3
EarthquakeVery Low7th1.3 of 5<0.01
HailVery Low6th1.2 of 51.7

Perils not assessed in Hardee County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "No Rating" for this county
Winter weatherFEMA rating is "No Rating" for this county
Ice stormFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Hardee County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.