P L BARTOW
OperatingNatural Gas power plant
- Capacity
- 1,476 MW
- Primary fuel
- Natural Gas
- County
- Pinellas County
- Operator
- DUKE ENERGY FLORIDA, INC
- Status
- Operating
- Commissioned
- 1972
- EIA plant ID
- 634
- Generators
- 9
- Technology
- Natural Gas Fired Combined Cycle
- Net generation (2024)
- 6,301 GWh
- Capacity factor (2024, EIA nameplate)
- 49%
- Data vintage
- EIA-860 2024 final; EIA-923 2022-2024 final
- Coordinates
- 27.8596, -82.6018
P L BARTOW, a 1,476 MW Natural Gas power plant in Pinellas County, Florida. Operated by DUKE ENERGY FLORIDA, INC, commissioned 1972.
How P L BARTOW compares
With 1,476 MW of capacity, P L BARTOW ranks 13th among the 110 operating power plants Bywatts maps in Florida and 10th of the 55 operating Natural Gas plants in the state. It accounts for about 3.3% of Florida's operating Natural Gas capacity and 2.3% of all operating capacity in the state. Nationally it is the 30th-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1972, it is older than 81% of the 108 operating Florida plants with a recorded commissioning year. Its operator, DUKE ENERGY FLORIDA, INC, runs 10 operating plants in Florida totaling 11,233 MW. It shares Pinellas County with 2 other operating plants, BAYBORO and GCS ENERGY RECOVERY OF PINELLAS, INC.
EIA-860 lists 9 generators at the site with 1,476 MW of nameplate capacity, mainly natural gas fired combined cycle technology. Net generation was 6,301 GWh in 2024 (a 49% capacity factor), down 5% from 2022. Its generators came online between 1972 and 2009.
Grid neighborhood
The nearest named substation is LAKE TARPON (500 kV), about 14.1 miles away; the closest transmission line found within 10 miles is a 230 kV line owned by DUKE ENERGY FLORIDA, LLC, under 0.1 miles away. Another 10 operating power plants totaling 7,584 MW sit within 25 miles; the largest is MANATEE (2,951 MW, Natural Gas). Within 50 miles are 3 mapped data centers; the nearest is WOW! Business (Tampa Datacenter) in Tampa, about 10.6 miles away.
Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology
Weather peril exposure
P L BARTOW is a 1,476 MW natural gas power plant in Pinellas County, FL, operated by DUKE ENERGY FLORIDA, INC, commissioned in 1972. Pinellas County carries elevated modeled catastrophe exposure in the FEMA National Risk Index, scoring 3.3 of 5 at the 57th national percentile. Lightning is the leading peril, rated Very High by FEMA at the 91st percentile.
The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.
Pinellas County hazard ratings
| Peril | FEMA rating | National percentile | Peril score | Events per year |
|---|---|---|---|---|
| Lightning | Very High | 91st | 4.6 of 5 | 94.4 |
| Hurricane | Very High | 91st | 4.6 of 5 | 0.23 |
| Coastal flooding | Very High | 65th | 3.6 of 5 | 3.7 |
| Wildfire | Relatively Low | 47th | 2.9 of 5 | <0.01 |
| Hail | Relatively High | 40th | 2.6 of 5 | 1.2 |
| Tornado | Very High | 37th | 2.5 of 5 | 0.68 |
| Riverine flooding | Relatively High | 16th | 1.6 of 5 | 1.6 |
| Heat wave | Relatively Moderate | 12th | 1.5 of 5 | 3.0 |
| Earthquake | Relatively Low | 10th | 1.4 of 5 | <0.01 |
| Strong wind | Relatively Moderate | 9th | 1.4 of 5 | 0.63 |
Perils not assessed in Pinellas County
These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.
| Peril | Why it is not scored |
|---|---|
| Winter weather | FEMA rating is "No Rating" for this county |
| Ice storm | FEMA rating is "Not Applicable" for this county |
Model hail, wind and flood exposure for Pinellas County in the weather risk calculator
Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.
Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.