INTERSTATE PAPER LLC RICEBORO

Operating

Biomass power plant

Capacity
13 MW
Primary fuel
Biomass
County
Liberty County
Operator
INTERSTATE PAPER LLC
Status
Operating
Commissioned
1968
EIA plant ID
54281
Coordinates
31.7414, -81.4074

See it on the map

INTERSTATE PAPER LLC RICEBORO, a 13 MW Biomass power plant in Liberty County, Georgia. Operated by INTERSTATE PAPER LLC, commissioned 1968.

Weather peril exposure

INTERSTATE PAPER LLC RICEBORO is a 13 MW biomass power plant in Liberty County, GA, operated by INTERSTATE PAPER LLC, commissioned in 1968. Liberty County carries critical modeled catastrophe exposure in the FEMA National Risk Index, scoring 4.7 of 5 at the 94th national percentile. Hurricane is the leading peril, rated Relatively High by FEMA at the 99th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a biomass plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

4.7 of 5Modeled catastrophe exposure
CriticalExposure band
HurricaneLeading peril
Relatively ModerateFEMA county risk rating

Liberty County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HurricaneRelatively High99th5.0 of 50.31
LightningRelatively Moderate78th4.1 of 569.7
EarthquakeRelatively Low76th4.0 of 5<0.01
WildfireRelatively Low67th3.7 of 5<0.01
Ice stormRelatively Low57th3.3 of 50.35
HailRelatively Low56th3.2 of 52.0
Heat waveRelatively Low42nd2.7 of 59.0
Winter weatherVery Low39th2.6 of 50.56
Coastal floodingRelatively Low38th2.5 of 53.6
Riverine floodingRelatively Low36th2.4 of 50.32
TornadoRelatively Low32nd2.3 of 50.20
Strong windRelatively Low12th1.5 of 51.1

Model hail, wind and flood exposure for Liberty County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.