ROCKY MOUNTAIN HYDROELECTRIC PLANT

Operating

Hydro power plant

Capacity
848 MW
Primary fuel
Hydro
County
Floyd County
Operator
OGLETHORPE POWER CORPORATION
Status
Operating
Commissioned
1995
EIA plant ID
6189
Generators
3
Technology
Hydroelectric Pumped Storage
Net generation (2024)
-426 GWh
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
34.3555, -85.3039

See it on the map

ROCKY MOUNTAIN HYDROELECTRIC PLANT, an 848 MW Hydro power plant in Floyd County, Georgia. Operated by OGLETHORPE POWER CORPORATION, commissioned 1995.

How ROCKY MOUNTAIN HYDROELECTRIC PLANT compares

With 848 MW of capacity, ROCKY MOUNTAIN HYDROELECTRIC PLANT ranks 13th among the 104 operating power plants Bywatts maps in Georgia and is the largest of the 29 operating Hydro plants in the state. It accounts for about 24% of Georgia's operating Hydro capacity and 2.4% of all operating capacity in the state. Nationally it is the 25th-largest of the 1,243 operating Hydro plants in the database. Commissioned in 1995, it is newer than 66% of the 101 operating Georgia plants with a recorded commissioning year. Its operator, OGLETHORPE POWER CORPORATION, runs 8 operating plants in Georgia totaling 4,973 MW. It shares Floyd County with one other operating plant, ROME MILL.

EIA-860 lists 3 generators at the site with 848 MW of nameplate capacity, all hydroelectric pumped storage technology. The plant was a net consumer of electricity in 2024 (-426 GWh), which is typical of pumped storage.

Grid neighborhood

The closest transmission line found within 10 miles is a 230 kV line owned by GEORGIA TRANSMISSION CORP, under 0.1 miles away. One other operating power plant sits within 25 miles: ROME MILL (70 MW, Biomass).

Computed by Bywatts from HIFLD power plant and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

ROCKY MOUNTAIN HYDROELECTRIC PLANT is an 848 MW hydro power plant in Floyd County, GA, operated by OGLETHORPE POWER CORPORATION, commissioned in 1995. Floyd County carries elevated modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.8 of 5 at the 46th national percentile. Tornado is the leading peril, rated Relatively High by FEMA at the 83rd percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a hydro plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.8 of 5Modeled catastrophe exposure
ElevatedExposure band
TornadoLeading peril
Relatively ModerateFEMA county risk rating

Floyd County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
TornadoRelatively High83rd4.3 of 50.38
EarthquakeRelatively Low79th4.2 of 5<0.01
LightningRelatively Moderate79th4.1 of 561.8
Strong windRelatively High73rd3.9 of 53.6
WildfireRelatively Low61st3.4 of 5<0.01
HailRelatively Moderate53rd3.1 of 55.4
HurricaneRelatively Low52nd3.1 of 50.03
Riverine floodingRelatively Moderate50th3.0 of 51.2
Ice stormRelatively Moderate48th2.9 of 50.57
Heat waveRelatively Low17th1.7 of 52.1
Winter weatherVery Low10th1.4 of 54.0

Perils not assessed in Floyd County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Floyd County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.