EAST BEND

Operating

Coal power plant

Capacity
669 MW
Primary fuel
Coal
County
Boone County
Operator
DUKE ENERGY KENTUCKY INC
Status
Operating
Commissioned
1981
EIA plant ID
6018
Generators
1
Technology
Conventional Steam Coal
Net generation (2024)
2,264 GWh
Capacity factor (2024, EIA nameplate)
33%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
38.9053, -84.8515

See it on the map

EAST BEND, a 669 MW Coal power plant in Boone County, Kentucky. Operated by DUKE ENERGY KENTUCKY INC, commissioned 1981.

How EAST BEND compares

With 669 MW of capacity, EAST BEND ranks 11th among the 31 operating power plants Bywatts maps in Kentucky and 8th of the 12 operating Coal plants in the state. It accounts for about 4.0% of Kentucky's operating Coal capacity and 3.1% of all operating capacity in the state. Nationally it is the 140th-largest of the 324 operating Coal plants in the database. Commissioned in 1981, it is newer than 53% of the 30 operating Kentucky plants with a recorded commissioning year.

EIA-860 lists 1 generator at the site with 772 MW of nameplate capacity, all conventional steam coal technology (this page's HIFLD capacity figure is 669 MW). Net generation was 2,264 GWh in 2024 (a 33% capacity factor), down 18% from 2022.

Grid neighborhood

The nearest named substation is HOOSIER FAIRVIEW, about 15.8 miles away; the closest transmission line found within 10 miles is a 345 kV line owned by EAST KENTUCKY POWER COOP, INC, under 0.1 miles away. Another 6 operating power plants totaling 4,919 MW sit within 25 miles; the largest is GHENT (2,226 MW, Coal). Within 50 miles are 7 mapped data centers; the nearest is CyrusOne Florence in Florence, about 13.5 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

EAST BEND is a 669 MW coal power plant in Boone County, KY, operated by DUKE ENERGY KENTUCKY INC, commissioned in 1981. Boone County carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.0 of 5 at the 24th national percentile. Tornado is the leading peril, rated Relatively High by FEMA at the 89th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a coal plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.0 of 5Modeled catastrophe exposure
ModerateExposure band
TornadoLeading peril
Relatively LowFEMA county risk rating

Boone County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
TornadoRelatively High89th4.6 of 50.18
EarthquakeRelatively Low66th3.6 of 5<0.01
Strong windRelatively High63rd3.5 of 54.0
Winter weatherRelatively Low55th3.2 of 510.8
Ice stormRelatively Moderate46th2.9 of 50.91
Heat waveRelatively Low35th2.4 of 56.7
HailRelatively Low31st2.3 of 53.6
LightningRelatively Moderate25th2.0 of 551.0
Riverine floodingRelatively Low9th1.4 of 52.1
HurricaneVery Low5th1.2 of 5<0.01
WildfireVery Low5th1.2 of 5<0.01

Perils not assessed in Boone County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Boone County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.