HARFORD WASTE TO ENERGY FACILITY

Operating

Biomass power plant

Capacity
1 MW
Primary fuel
Biomass
County
Harford County
Operator
ENERGY RECOVERY OPERATIONS, INC
Status
Operating
EIA plant ID
54935
Coordinates
39.4041, -76.3173

See it on the map

HARFORD WASTE TO ENERGY FACILITY, a 1 MW Biomass power plant in Harford County, Maryland. Operated by ENERGY RECOVERY OPERATIONS, INC.

Weather peril exposure

HARFORD WASTE TO ENERGY FACILITY is a 1 MW biomass power plant in Harford County, MD, operated by ENERGY RECOVERY OPERATIONS, INC. Harford County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.2 of 5 at the 5th national percentile. Hurricane is the leading peril, rated Relatively Moderate by FEMA at the 73rd percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a biomass plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.2 of 5Modeled catastrophe exposure
LowExposure band
HurricaneLeading peril
Relatively LowFEMA county risk rating

Harford County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HurricaneRelatively Moderate73rd3.9 of 50.08
EarthquakeRelatively Low55th3.2 of 5<0.01
Winter weatherRelatively High53rd3.1 of 512.7
Coastal floodingRelatively Low51st3.1 of 53.7
Strong windRelatively Moderate39th2.5 of 57.4
LightningRelatively Moderate34th2.4 of 536.3
TornadoRelatively Low19th1.8 of 50.35
Riverine floodingRelatively Moderate11th1.4 of 52.9
WildfireVery Low10th1.4 of 5<0.01
Ice stormRelatively Low7th1.3 of 51.1
HailVery Low4th1.2 of 53.0
Heat waveRelatively Moderate1st1.0 of 55.0

Model hail, wind and flood exposure for Harford County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.