DARTMOUTH POWER ASSOCIATES LP

Operating

Natural Gas power plant

Capacity
102 MW
Primary fuel
Natural Gas
County
Bristol County
Operator
MORRIS ENERGY OPERATIONS COMPANY, LLC
Status
Operating
Commissioned
1992
EIA plant ID
52026
Generators
3
Technology
Natural Gas Fired Combined Cycle
Net generation (2024)
63 GWh
Capacity factor (2024, EIA nameplate)
7.4%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
41.6730, -70.9989

See it on the map

DARTMOUTH POWER ASSOCIATES LP, a 102 MW Natural Gas power plant in Bristol County, Massachusetts. One of 160 power plants tracked in Massachusetts on Bywatts.

How DARTMOUTH POWER ASSOCIATES LP compares

With 102 MW of capacity, DARTMOUTH POWER ASSOCIATES LP ranks 20th among the 125 operating power plants Bywatts maps in Massachusetts and 15th of the 22 operating Natural Gas plants in the state. It accounts for about 1.9% of Massachusetts's operating Natural Gas capacity and 1.1% of all operating capacity in the state. Nationally it is the 673rd-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1992, it is older than 52% of the 122 operating Massachusetts plants with a recorded commissioning year. It shares Bristol County with 8 other operating plants, including DIGHTON POWER PLANT and CLEARY FLOOD.

EIA-860 lists 3 generators at the site with 97 MW of nameplate capacity, mainly natural gas fired combined cycle technology. Net generation was 63 GWh in 2024 (a 7.4% capacity factor), up 4% from 2022. Its generators came online between 1992 and 2009.

Grid neighborhood

The closest transmission line found within 10 miles is a 115 kV line owned by NSTAR ELECTRIC COMPANY, about 0.5 miles away. Another 14 operating power plants totaling 1,264 MW sit within 25 miles; the largest is MANCHESTER STREET (515 MW, Natural Gas). Within 50 miles are 3 mapped data centers; the nearest is Markley Group One Summer Street Boston in Boston, about 47.2 miles away.

Computed by Bywatts from HIFLD power plant and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

DARTMOUTH POWER ASSOCIATES LP is a 102 MW natural gas power plant in Bristol County, MA, operated by MORRIS ENERGY OPERATIONS COMPANY, LLC, commissioned in 1992. Bristol County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.3 of 5 at the 6th national percentile. Hurricane is the leading peril, rated Relatively Moderate by FEMA at the 78th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.3 of 5Modeled catastrophe exposure
LowExposure band
HurricaneLeading peril
Relatively ModerateFEMA county risk rating

Bristol County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HurricaneRelatively Moderate78th4.1 of 50.19
EarthquakeRelatively Low58th3.3 of 5<0.01
Coastal floodingRelatively Moderate52nd3.1 of 53.7
Ice stormRelatively High41st2.6 of 50.60
Strong windRelatively High23rd1.9 of 50.74
Riverine floodingRelatively High22nd1.9 of 53.3
TornadoRelatively Low15th1.6 of 50.11
Winter weatherRelatively Low14th1.6 of 511.1
WildfireVery Low14th1.6 of 5<0.01
LightningRelatively Moderate8th1.3 of 520.0
Heat waveRelatively Moderate7th1.3 of 55.1
HailVery Low2nd1.1 of 51.3

Model hail, wind and flood exposure for Bristol County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.