SILVER LAKE SOLAR PHOTOVOLTAIC FACILITY

Operating

Solar power plant

Capacity
2 MW
Primary fuel
Solar
County
Berkshire County
Operator
WESTERN MASSACHUSETTS ELECTRIC COMPANY
Status
Operating
Commissioned
2010
EIA plant ID
57676
Coordinates
42.4526, -73.2407

See it on the map

SILVER LAKE SOLAR PHOTOVOLTAIC FACILITY, a 2 MW Solar power plant in Berkshire County, Massachusetts.

Weather peril exposure

SILVER LAKE SOLAR PHOTOVOLTAIC FACILITY is a 2 MW solar power plant in Berkshire County, MA, operated by WESTERN MASSACHUSETTS ELECTRIC COMPANY, commissioned in 2010. Berkshire County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.4 of 5 at the 10th national percentile. Riverine flooding is the leading peril, rated Relatively Moderate by FEMA at the 87th percentile.

1.4 of 5Modeled catastrophe exposure
LowExposure band
Riverine floodingLeading peril
StandardInsurability signal

Berkshire County hazard ratings

PerilFEMA ratingNational percentilePeril scoreShare of modeled lossEvents per year
Riverine floodingRelatively Moderate87th4.5 of 532%2.6
HurricaneRelatively Moderate78th4.1 of 547%0.08
Ice stormRelatively Moderate57th3.3 of 53%1.2
EarthquakeRelatively Low47th2.9 of 51%<0.01
Winter weatherRelatively Low45th2.8 of 51%21.8
LightningRelatively Moderate36th2.4 of 51%26.3
TornadoRelatively Low27th2.1 of 59%0.27
WildfireVery Low17th1.7 of 5<1%<0.01
Strong windRelatively Moderate9th1.4 of 51%1.8
HailRelatively Low8th1.3 of 55%3.1
Heat waveVery Low4th1.2 of 5<1%1.7

Perils not assessed in Berkshire County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Hail exposure and deductible structure

Hail scores 1.3 of 5, which sits in the 1% to 2% percentage deductible range carriers are quoting for that exposure. Named windstorm and severe convective wind score 4.1 of 5, indicating a 2% to 5% wind deductible. Ranges, not single figures. The final structure is set by the carrier.

Percentage hail deductible range: 1% to 2% of insured value. Wind deductible range: 2% to 5%. These are the structures commonly seen at this exposure, not an offer and not a rate.

Modeled annual loss for a 2 MW solar array

At an assumed replacement value of $0.90 per watt, or $1.6M insured, the modeled expected annual loss for a fixed tilt ground mount array in Berkshire County is $345 a year, $192 per MW, 0.02% of insured value.

Heat is modeled as a production risk rather than a property loss: 0.1% of annual yield in this county.

Insurability signal: Standard. Named windstorm and severe wind at 4.1 of 5.

Model hail, wind and flood exposure for Berkshire County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile, and the modeled loss applies the Bywatts solar vulnerability layer. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level. The solar vulnerability layer that turns FEMA building loss into modeled solar loss was derived by Bywatts and revised on physical reasoning. It has not been reviewed by a practising underwriter.