ELK RIVER

Operating

Biomass power plant

Capacity
239 MW
Primary fuel
Biomass
County
Sherburne County
Operator
GREAT RIVER ENERGY
Status
Operating
Commissioned
2009
EIA plant ID
2039
Generators
1
Net generation (2024)
45.4 GWh
Capacity factor (2024, EIA nameplate)
2.7%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
45.2968, -93.5584

See it on the map

ELK RIVER, a 239 MW Biomass power plant in Sherburne County, Minnesota. Operated by GREAT RIVER ENERGY, commissioned 2009.

How ELK RIVER compares

With 239 MW of capacity, ELK RIVER ranks 17th among the 215 operating power plants Bywatts maps in Minnesota and is the largest of the 12 operating Biomass plants in the state. It accounts for about 38% of Minnesota's operating Biomass capacity and 1.5% of all operating capacity in the state. Nationally it is the largest of the 350 operating Biomass plants in the database. Commissioned in 2009, it is newer than 85% of the 200 operating Minnesota plants with a recorded commissioning year. Its operator, GREAT RIVER ENERGY, runs 8 operating plants in Minnesota totaling 1,550 MW. It shares Sherburne County with 2 other operating plants, SHERCO and ELK RIVER PEAKING STATION.

Under the same EIA plant code, EIA-860 lists 1 generator at the site with 191 MW of nameplate capacity (this page's HIFLD capacity figure is 239 MW). Net generation was 45.4 GWh in 2024 (a 2.7% capacity factor).

Grid neighborhood

The closest transmission line found within 10 miles is a 230 kV line, about 0.2 miles away. Another 6 operating power plants totaling 3,802 MW sit within 25 miles; the largest is SHERCO (2,469 MW, Coal). Within 50 miles are 2 mapped data centers; the nearest is Implex Minneapolis in Minneapolis, about 24.9 miles away.

Computed by Bywatts from HIFLD power plant and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

ELK RIVER is a 239 MW biomass power plant in Sherburne County, MN, operated by GREAT RIVER ENERGY, commissioned in 2009. Sherburne County carries high modeled catastrophe exposure in the FEMA National Risk Index, scoring 3.8 of 5 at the 70th national percentile. Strong wind is the leading peril, rated Relatively High by FEMA at the 92nd percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a biomass plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

3.8 of 5Modeled catastrophe exposure
HighExposure band
Strong windLeading peril
Relatively LowFEMA county risk rating

Sherburne County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Strong windRelatively High92nd4.7 of 54.0
Heat waveRelatively Low84th4.4 of 53.4
HailRelatively Moderate74th4.0 of 56.1
Riverine floodingRelatively Low64th3.6 of 50.21
TornadoRelatively Moderate60th3.4 of 50.28
WildfireRelatively Low60th3.4 of 5<0.01
Ice stormRelatively Low44th2.8 of 50.48
LightningRelatively Moderate31st2.3 of 533.6
EarthquakeVery Low2nd1.1 of 5<0.01
Winter weatherRelatively Low1st1.0 of 516.8

Perils not assessed in Sherburne County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
HurricaneFEMA rating is "Not Applicable" for this county
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Sherburne County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.