FORTISTAR NORTH TONAWANDA

Operating

Natural Gas power plant

Capacity
55 MW
Primary fuel
Natural Gas
County
Niagara County
Operator
NORTH AMERICAN ENERGY SERVICES
Status
Operating
Commissioned
1993
EIA plant ID
54131
Generators
2
Technology
Natural Gas Fired Combined Cycle
Net generation (2024)
289 GWh
Capacity factor (2024, EIA nameplate)
50%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
43.0484, -78.8536

See it on the map

FORTISTAR NORTH TONAWANDA, a 55 MW Natural Gas power plant in Niagara County, New York. Operated by NORTH AMERICAN ENERGY SERVICES, commissioned 1993.

How FORTISTAR NORTH TONAWANDA compares

With 55 MW of capacity, FORTISTAR NORTH TONAWANDA ranks 86th among the 320 operating power plants Bywatts maps in New York and 50th of the 68 operating Natural Gas plants in the state. It accounts for about 0.3% of New York's operating Natural Gas capacity and 0.1% of all operating capacity in the state. Nationally it is the 792nd-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1993, it is newer than 69% of the 312 operating New York plants with a recorded commissioning year. It shares Niagara County with 7 other operating plants, including ROBERT MOSES NIAGARA and LEWISTON NIAGARA.

EIA-860 lists 2 generators at the site with 66 MW of nameplate capacity, all natural gas fired combined cycle technology (this page's HIFLD capacity figure is 55 MW). Net generation was 289 GWh in 2024 (a 50% capacity factor), about 5 times its 2022 output.

Grid neighborhood

The nearest named substation is HUNTLEY (230 kV), about 6.6 miles away; the closest transmission line found within 10 miles is a 115 kV line owned by NIAGARA MOHAWK POWER CORP., under 0.1 miles away. Another 10 operating power plants totaling 3,050 MW sit within 25 miles; the largest is ROBERT MOSES NIAGARA (2,429 MW, Hydro). Within 50 miles is one mapped data center, ixColo in Buffalo, about 11.4 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

FORTISTAR NORTH TONAWANDA is a 55 MW natural gas power plant in Niagara County, NY, operated by NORTH AMERICAN ENERGY SERVICES, commissioned in 1993. Niagara County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.1 of 5 at the 2nd national percentile. Riverine flooding is the leading peril, rated Relatively Moderate by FEMA at the 68th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.1 of 5Modeled catastrophe exposure
LowExposure band
Riverine floodingLeading peril
Relatively ModerateFEMA county risk rating

Niagara County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Riverine floodingRelatively Moderate68th3.7 of 51.3
Ice stormRelatively High66th3.6 of 53.0
Strong windRelatively Moderate40th2.6 of 50.97
HurricaneVery Low34th2.3 of 50.03
EarthquakeRelatively Low32nd2.3 of 5<0.01
Winter weatherRelatively Low20th1.8 of 518.9
TornadoRelatively Low14th1.5 of 50.07
HailRelatively Low13th1.5 of 50.51
Coastal floodingVery Low10th1.4 of 50.01
LightningRelatively Moderate6th1.3 of 527.6
Heat waveRelatively Low5th1.2 of 52.9
WildfireVery Low0th1.0 of 5<0.01

Model hail, wind and flood exposure for Niagara County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.