GREENVILLE ELECTRIC GENERATING STATION

Operating

Natural Gas power plant

Capacity
236 MW
Primary fuel
Natural Gas
County
Darke County
Operator
BUCKEYE POWER, INC
Status
Operating
Commissioned
2000
EIA plant ID
55228
Generators
4
Technology
Natural Gas Fired Combustion Turbine
Net generation (2024)
105 GWh
Capacity factor (2024, EIA nameplate)
5.1%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
40.0757, -84.6159

See it on the map

GREENVILLE ELECTRIC GENERATING STATION, a 236 MW Natural Gas power plant in Darke County, Ohio. Operated by BUCKEYE POWER, INC, commissioned 2000.

How GREENVILLE ELECTRIC GENERATING STATION compares

With 236 MW of capacity, GREENVILLE ELECTRIC GENERATING STATION ranks 23rd among the 102 operating power plants Bywatts maps in Ohio and 14th of the 25 operating Natural Gas plants in the state. It accounts for about 2.5% of Ohio's operating Natural Gas capacity and 1.1% of all operating capacity in the state. Nationally it is the 518th-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 2000, it is newer than 45% of the 99 operating Ohio plants with a recorded commissioning year. It shares Darke County with one other operating plant, VERSAILLES PEAKING.

EIA-860 lists 4 generators at the site with 236 MW of nameplate capacity, all natural gas fired combustion turbine technology. Net generation was 105 GWh in 2024 (a 5.1% capacity factor), down 48% from 2022.

Grid neighborhood

The closest transmission line found within 10 miles is a 138 kV line owned by DAYTON POWER & LIGHT CO, about 0.1 miles away. Another 4 operating power plants totaling 218 MW sit within 25 miles; the largest is WHITEWATER VALLEY (94 MW, Coal). Within 50 miles is one mapped data center, CyrusOne Hamilton in Hamilton, about 47.7 miles away.

Computed by Bywatts from HIFLD power plant and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

GREENVILLE ELECTRIC GENERATING STATION is a 236 MW natural gas power plant in Darke County, OH, operated by BUCKEYE POWER, INC, commissioned in 2000. Darke County carries elevated modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.8 of 5 at the 44th national percentile. Tornado is the leading peril, rated Relatively Moderate by FEMA at the 89th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.8 of 5Modeled catastrophe exposure
ElevatedExposure band
TornadoLeading peril
Relatively LowFEMA county risk rating

Darke County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
TornadoRelatively Moderate89th4.5 of 50.43
Heat waveVery Low84th4.4 of 54.2
EarthquakeRelatively Low78th4.1 of 5<0.01
Strong windRelatively Moderate56th3.2 of 53.3
HailRelatively Low54th3.2 of 53.7
Winter weatherRelatively Low45th2.8 of 512.4
Ice stormRelatively Low32nd2.3 of 50.89
LightningRelatively Low28th2.1 of 544.7
Riverine floodingRelatively Low21st1.9 of 52.0
HurricaneVery Low18th1.7 of 5<0.01
WildfireVery Low4th1.2 of 5<0.01

Perils not assessed in Darke County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Darke County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.