MORGANTOWN SOLAR PARK

Operating

Solar power plant

Capacity
2 MW
Primary fuel
Solar
County
Berks County
Operator
THE HANKIN GROUP
Status
Operating
Commissioned
2011
EIA plant ID
57362
Coordinates
40.1521, -75.8659

See it on the map

MORGANTOWN SOLAR PARK, a 2 MW Solar power plant in Berks County, Pennsylvania. Operated by THE HANKIN GROUP, commissioned 2011.

Weather peril exposure

MORGANTOWN SOLAR PARK is a 2 MW solar power plant in Berks County, PA, operated by THE HANKIN GROUP, commissioned in 2011. Berks County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.4 of 5 at the 9th national percentile. Hurricane is the leading peril, rated Relatively Moderate by FEMA at the 78th percentile.

1.4 of 5Modeled catastrophe exposure
LowExposure band
HurricaneLeading peril
StandardInsurability signal

Berks County hazard ratings

PerilFEMA ratingNational percentilePeril scoreShare of modeled lossEvents per year
HurricaneRelatively Moderate78th4.1 of 553%0.06
EarthquakeRelatively Moderate66th3.6 of 51%<0.01
Winter weatherVery High61st3.4 of 51%12.6
Strong windRelatively High34th2.4 of 56%6.2
TornadoRelatively High34th2.3 of 514%0.47
Riverine floodingRelatively High30th2.2 of 517%4.8
LightningRelatively High16th1.6 of 51%34.9
Ice stormRelatively Moderate13th1.5 of 5<1%1.4
HailRelatively Low9th1.4 of 57%2.6
Heat waveRelatively Moderate8th1.3 of 5<1%6.3
WildfireVery Low7th1.3 of 5<1%<0.01

Perils not assessed in Berks County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Hail exposure and deductible structure

Hail scores 1.4 of 5, which sits in the 1% to 2% percentage deductible range carriers are quoting for that exposure. Named windstorm and severe convective wind score 4.1 of 5, indicating a 2% to 5% wind deductible. Ranges, not single figures. The final structure is set by the carrier.

Percentage hail deductible range: 1% to 2% of insured value. Wind deductible range: 2% to 5%. These are the structures commonly seen at this exposure, not an offer and not a rate.

Modeled annual loss for a 2 MW solar array

At an assumed replacement value of $0.90 per watt, or $1.8M insured, the modeled expected annual loss for a fixed tilt ground mount array in Berks County is $353 a year, $177 per MW, 0.02% of insured value.

Heat is modeled as a production risk rather than a property loss: 0.2% of annual yield in this county.

Insurability signal: Standard. Named windstorm and severe wind at 4.1 of 5.

Model hail, wind and flood exposure for Berks County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile, and the modeled loss applies the Bywatts solar vulnerability layer. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level. The solar vulnerability layer that turns FEMA building loss into modeled solar loss was derived by Bywatts and revised on physical reasoning. It has not been reviewed by a practising underwriter.