INTERNATIONAL PAPER EASTOVER FACILITY

Operating

Biomass power plant

Capacity
110 MW
Primary fuel
Biomass
County
Richland County
Operator
INTERNATIONAL PAPER CO-EASTOVR
Status
Operating
Commissioned
1984
EIA plant ID
52151
Generators
2
Technology
Wood/Wood Waste Biomass
Net generation (2024)
520 GWh
Capacity factor (2024, EIA nameplate)
54%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
33.8865, -80.6406

See it on the map

INTERNATIONAL PAPER EASTOVER FACILITY, a 110 MW Biomass power plant in Richland County, South Carolina.

How INTERNATIONAL PAPER EASTOVER FACILITY compares

With 110 MW of capacity, INTERNATIONAL PAPER EASTOVER FACILITY ranks 29th among the 83 operating power plants Bywatts maps in South Carolina and is the largest of the 6 operating Biomass plants in the state. It accounts for about 33% of South Carolina's operating Biomass capacity and 0.5% of all operating capacity in the state. Nationally it is the 13th-largest of the 350 operating Biomass plants in the database. Commissioned in 1984, it is older than 52% of the 82 operating South Carolina plants with a recorded commissioning year. It shares Richland County with 4 other operating plants, including WATEREE and COIT GT.

EIA-860 lists 2 generators at the site with 110 MW of nameplate capacity, all wood/wood waste biomass technology. Net generation was 520 GWh in 2024 (a 54% capacity factor), down 4% from 2022. Its generators came online between 1984 and 1991.

Grid neighborhood

The closest transmission line found within 10 miles is a 115 kV line owned by SOUTH CAROLINA ELECTRIC&GAS CO, under 0.1 miles away. Another 6 operating power plants totaling 1,529 MW sit within 25 miles; the largest is WATEREE (772 MW, Coal).

Computed by Bywatts from HIFLD power plant and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

INTERNATIONAL PAPER EASTOVER FACILITY is a 110 MW biomass power plant in Richland County, SC, operated by INTERNATIONAL PAPER CO-EASTOVR, commissioned in 1984. Richland County carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.3 of 5 at the 33rd national percentile. Hurricane is the leading peril, rated Relatively High by FEMA at the 83rd percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a biomass plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.3 of 5Modeled catastrophe exposure
ModerateExposure band
HurricaneLeading peril
Relatively ModerateFEMA county risk rating

Richland County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HurricaneRelatively High83rd4.3 of 50.19
Ice stormVery High81st4.3 of 51.4
EarthquakeRelatively Moderate80th4.2 of 5<0.01
LightningRelatively High72nd3.9 of 560.1
TornadoRelatively High41st2.6 of 50.56
WildfireRelatively Low37th2.5 of 5<0.01
Riverine floodingRelatively High35th2.4 of 53.8
HailRelatively Moderate33rd2.3 of 53.9
Heat waveRelatively Moderate26th2.0 of 54.4
Winter weatherRelatively High17th1.7 of 51.9
Strong windRelatively High13th1.5 of 55.6

Perils not assessed in Richland County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Richland County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.