PACKAGING CORP OF AMERICA

Operating

Biomass power plant

Capacity
73 MW
Primary fuel
Biomass
County
Hardin County
Operator
PACKAGING CORP OF AMERICA
Status
Operating
Commissioned
1985
EIA plant ID
50296
Generators
2
Technology
Wood/Wood Waste Biomass
Net generation (2024)
412 GWh
Capacity factor (2024, EIA nameplate)
65%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
35.0477, -88.2661

See it on the map

PACKAGING CORP OF AMERICA, a 73 MW Biomass power plant in Hardin County, Tennessee. Operated by PACKAGING CORP OF AMERICA, commissioned 1985.

How PACKAGING CORP OF AMERICA compares

With 73 MW of capacity, PACKAGING CORP OF AMERICA ranks 27th among the 53 operating power plants Bywatts maps in Tennessee and is the largest of the 3 operating Biomass plants in the state. It accounts for about 57% of Tennessee's operating Biomass capacity and 0.4% of all operating capacity in the state. Nationally it is the 39th-largest of the 350 operating Biomass plants in the database. Commissioned in 1985, it is newer than 66% of the 53 operating Tennessee plants with a recorded commissioning year. It shares Hardin County with one other operating plant, PICKWICK LANDING DAM.

EIA-860 lists 2 generators at the site with 73 MW of nameplate capacity, all wood/wood waste biomass technology. Net generation was 412 GWh in 2024 (a 65% capacity factor), down 1% from 2022. Its generators came online between 1985 and 2010.

Grid neighborhood

The nearest named substation is COUNCE (161 kV), about 0.3 miles away; the closest transmission line found within 10 miles is a 161 kV line owned by TENNESSEE VALLEY AUTHORITY, under 0.1 miles away. One other operating power plant sits within 25 miles: PICKWICK LANDING DAM (240 MW, Hydro).

Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

PACKAGING CORP OF AMERICA is a 73 MW biomass power plant in Hardin County, TN, operated by PACKAGING CORP OF AMERICA, commissioned in 1985. Hardin County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.6 of 5 at the 15th national percentile. Earthquake is the leading peril, rated Relatively Moderate by FEMA at the 92nd percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a biomass plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.6 of 5Modeled catastrophe exposure
LowExposure band
EarthquakeLeading peril
Relatively LowFEMA county risk rating

Hardin County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
EarthquakeRelatively Moderate92nd4.7 of 5<0.01
Strong windRelatively High69th3.7 of 53.5
TornadoRelatively Moderate66th3.6 of 50.44
Riverine floodingRelatively Low61st3.4 of 51.1
HurricaneRelatively Low59th3.4 of 50.03
Heat waveRelatively Low55th3.2 of 513.7
LightningRelatively Moderate50th3.0 of 560.8
WildfireVery Low35th2.4 of 5<0.01
Ice stormRelatively Low33rd2.3 of 50.78
Winter weatherVery Low24th2.0 of 55.2
HailVery Low17th1.7 of 53.4

Perils not assessed in Hardin County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Hardin County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.