ODESSA ECTOR GENERATING STATION

Operating

Natural Gas power plant

Capacity
1,135 MW
Primary fuel
Natural Gas
County
Ector County
Operator
ODESSA-ECTOR POWER PARTNERS LP
Status
Operating
Commissioned
2001
EIA plant ID
55215
Generators
6
Technology
Natural Gas Fired Combined Cycle
Net generation (2024)
7,502 GWh
Capacity factor (2024, EIA nameplate)
74%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
31.8390, -102.3261

See it on the map

ODESSA ECTOR GENERATING STATION, a 1,135 MW Natural Gas power plant in Ector County, Texas. Operated by ODESSA-ECTOR POWER PARTNERS LP, commissioned 2001.

How ODESSA ECTOR GENERATING STATION compares

With 1,135 MW of capacity, ODESSA ECTOR GENERATING STATION ranks 21st among the 307 operating power plants Bywatts maps in Texas and 11th of the 134 operating Natural Gas plants in the state. It accounts for about 1.7% of Texas's operating Natural Gas capacity and 1.1% of all operating capacity in the state. Nationally it is the 71st-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 2001, it is newer than 47% of the 303 operating Texas plants with a recorded commissioning year. It shares Ector County with 3 other operating plants, including QUAIL RUN ENERGY CENTER and NOTREES WINDPOWER.

EIA-860 lists 6 generators at the site with 1,153 MW of nameplate capacity, all natural gas fired combined cycle technology. Net generation was 7,502 GWh in 2024 (a 74% capacity factor), up 28% from 2022.

Grid neighborhood

The closest transmission line found within 10 miles is a 138 kV line owned by ONCOR ELECTRIC DELIVERY CO., under 0.1 miles away. One other operating power plant sits within 25 miles: QUAIL RUN ENERGY CENTER (573 MW, Natural Gas).

Computed by Bywatts from HIFLD power plant and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

ODESSA ECTOR GENERATING STATION is a 1,135 MW natural gas power plant in Ector County, TX, operated by ODESSA-ECTOR POWER PARTNERS LP, commissioned in 2001. Ector County carries critical modeled catastrophe exposure in the FEMA National Risk Index, scoring 4.9 of 5 at the 98th national percentile. Hail is the leading peril, rated Relatively High by FEMA at the 98th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

4.9 of 5Modeled catastrophe exposure
CriticalExposure band
HailLeading peril
Relatively ModerateFEMA county risk rating

Ector County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HailRelatively High98th4.9 of 53.9
Winter weatherVery High75th4.0 of 55.7
WildfireRelatively Low71st3.8 of 5<0.01
Heat waveRelatively Moderate60th3.4 of 56.1
Ice stormRelatively Moderate46th2.8 of 50.42
TornadoRelatively Moderate45th2.8 of 50.36
Strong windRelatively High34th2.4 of 51.5
LightningRelatively High33rd2.3 of 543.5
Riverine floodingRelatively Moderate20th1.8 of 53.9
HurricaneVery Low18th1.7 of 5<0.01
EarthquakeVery Low15th1.6 of 5<0.01

Perils not assessed in Ector County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Ector County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.