MARCH POINT COGENERATION

Operating

Natural Gas power plant

Capacity
167 MW
Primary fuel
Natural Gas
County
Skagit County
Operator
MARCH POINT COGENERATION CO
Status
Operating
Commissioned
1991
EIA plant ID
54268
Generators
3
Technology
Natural Gas Fired Combustion Turbine
Net generation (2024)
990 GWh
Capacity factor (2024, EIA nameplate)
81%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
48.4701, -122.5611

See it on the map

MARCH POINT COGENERATION, a 167 MW Natural Gas power plant in Skagit County, Washington. Operated by MARCH POINT COGENERATION CO, commissioned 1991.

How MARCH POINT COGENERATION compares

With 167 MW of capacity, MARCH POINT COGENERATION ranks 38th among the 126 operating power plants Bywatts maps in Washington and 12th of the 17 operating Natural Gas plants in the state. It accounts for about 4.2% of Washington's operating Natural Gas capacity and 0.6% of all operating capacity in the state. Nationally it is the 582nd-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1991, it is newer than 60% of the 125 operating Washington plants with a recorded commissioning year. It shares Skagit County with 3 other operating plants, including FREDONIA and LOWER BAKER.

EIA-860 lists 3 generators at the site with 140 MW of nameplate capacity, all natural gas fired combustion turbine technology (this page's HIFLD capacity figure is 167 MW). Net generation was 990 GWh in 2024 (an 81% capacity factor), up 4% from 2022. Its generators came online between 1991 and 1993.

Grid neighborhood

The nearest named substation is MARCH POINT, about 0.8 miles away; the closest transmission line found within 10 miles is a 115 kV line owned by PUGET SOUND ENERGY INC, under 0.1 miles away. Another 3 operating power plants totaling 580 MW sit within 25 miles; the largest is FREDONIA (376 MW, Natural Gas). Within 50 miles is one mapped data center, CSSNW Bellingham in Bellingham, about 20.2 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

MARCH POINT COGENERATION is a 167 MW natural gas power plant in Skagit County, WA, operated by MARCH POINT COGENERATION CO, commissioned in 1991. Skagit County carries elevated modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.9 of 5 at the 48th national percentile. Coastal flooding is the leading peril, rated Relatively High by FEMA at the 99th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.9 of 5Modeled catastrophe exposure
ElevatedExposure band
Coastal floodingLeading peril
Relatively ModerateFEMA county risk rating

Skagit County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Coastal floodingRelatively High99th5.0 of 53.4
EarthquakeRelatively Moderate96th4.8 of 50.04
Riverine floodingRelatively Moderate78th4.1 of 50.32
Heat waveRelatively Low49th2.9 of 52.4
WildfireVery Low30th2.2 of 5<0.01
Winter weatherRelatively Moderate29th2.1 of 537.1
Ice stormRelatively High29th2.1 of 50.45
TornadoVery Low3rd1.1 of 50.02
LightningRelatively Low3rd1.1 of 57.3
HailVery Low2nd1.1 of 50.02
Strong windVery Low0th1.0 of 50.02

Perils not assessed in Skagit County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
HurricaneFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Skagit County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.