Coastal Energy
Charging Infrastructure · Design & Engineering
- Website
- coastalenergy.io
- View profile
Coastal Energy is a solar and energy industry company with 4 listed locations, including Fort Myers, Florida; Miami, Florida; and Naples, Florida. It is listed in 7 Bywatts categories, including Charging Infrastructure; Design & Engineering; and EPC Firms (Engineering, Procurement, Construction), with focus areas that include AC Charging Systems, Battery Integration and Design-Build. The listing links to its website, coastalenergy.io, and to its LinkedIn page.
Grid context
Within 25 miles of its Fort Myers, Florida office are 3 operating power plants totaling 2,891 MW; the largest is FORT MYERS (2,828 MW, Natural Gas).
Computed by Bywatts from HIFLD power plant records and EIA-860 retirement records; distances are straight-line. Sources and methodology
Bywatts lists 133 solar companies in Florida.
Categories
Charging Infrastructure · Design & Engineering · EPC Firms (Engineering, Procurement, Construction) · Energy Consultants · Energy Storage System Providers · Generation Systems · Installers & Field Services
Focus areas
AC Charging Systems · Battery Integration · Design-Build · EV Charger Installers · Electrical Contractors · Permitting & Environmental · Solar Installers · Solar PV Systems · Storage Installers · System Design · Turnkey EPC · UPS / Critical Backup