HOT SPRING GENERATING FACILITY

Operating

Natural Gas power plant

Capacity
715 MW
Primary fuel
Natural Gas
County
Hot Spring County
Operator
ENTERGY ARKANSAS INC
Status
Operating
Commissioned
2002
EIA plant ID
55418
Generators
3
Technology
Natural Gas Fired Combined Cycle
Net generation (2024)
2,035 GWh
Capacity factor (2024, EIA nameplate)
32%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
34.2976, -92.8683

See it on the map

HOT SPRING GENERATING FACILITY, a 715 MW Natural Gas power plant in Hot Spring County, Arkansas. Operated by ENTERGY ARKANSAS INC, commissioned 2002.

How HOT SPRING GENERATING FACILITY compares

With 715 MW of capacity, HOT SPRING GENERATING FACILITY ranks 8th among the 48 operating power plants Bywatts maps in Arkansas and 4th of the 15 operating Natural Gas plants in the state. It accounts for about 9.9% of Arkansas's operating Natural Gas capacity and 4.4% of all operating capacity in the state. Nationally it is the 181st-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 2002, it is newer than 68% of the 48 operating Arkansas plants with a recorded commissioning year. Its operator, ENTERGY ARKANSAS INC, runs 7 operating plants in Arkansas totaling 6,977 MW. It shares Hot Spring County with 3 other operating plants, including LAKE CATHERINE and MAGNET COVE.

EIA-860 lists 3 generators at the site with 715 MW of nameplate capacity, all natural gas fired combined cycle technology. Net generation was 2,035 GWh in 2024 (a 32% capacity factor), down 40% from 2022.

Grid neighborhood

The closest transmission line found within 10 miles is a 500 kV line owned by ENTERGY ARKANSAS INC, under 0.1 miles away. Another 5 operating power plants totaling 1,631 MW sit within 25 miles; the largest is LAKE CATHERINE (752 MW, Natural Gas).

Computed by Bywatts from HIFLD power plant and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

HOT SPRING GENERATING FACILITY is a 715 MW natural gas power plant in Hot Spring County, AR, operated by ENTERGY ARKANSAS INC, commissioned in 2002. Hot Spring County carries critical modeled catastrophe exposure in the FEMA National Risk Index, scoring 4.3 of 5 at the 82nd national percentile. Lightning is the leading peril, rated Relatively High by FEMA at the 100th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

4.3 of 5Modeled catastrophe exposure
CriticalExposure band
LightningLeading peril
Relatively LowFEMA county risk rating

Hot Spring County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
LightningRelatively High100th5.0 of 564.2
Ice stormRelatively High96th4.8 of 51.1
HailRelatively Moderate84th4.3 of 55.0
EarthquakeRelatively Low83rd4.3 of 5<0.01
Winter weatherRelatively Low77th4.1 of 54.1
Strong windRelatively Moderate76th4.0 of 53.3
Riverine floodingRelatively Low74th3.9 of 51.8
TornadoRelatively Moderate58th3.3 of 50.40
Heat waveRelatively Low56th3.2 of 518.1
WildfireVery Low53rd3.1 of 5<0.01
HurricaneVery Low53rd3.1 of 50.04

Perils not assessed in Hot Spring County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Hot Spring County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.