LIMON GENERATING STATION

Operating

Natural Gas power plant

Capacity
154 MW
Primary fuel
Natural Gas
County
Lincoln County
Operator
TRI-STATE G & T ASSN, INC
Status
Operating
Commissioned
2002
EIA plant ID
55504
Generators
2
Technology
Natural Gas Fired Combustion Turbine
Net generation (2024)
216 GWh
Capacity factor (2024, EIA nameplate)
16%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
39.2038, -103.7002

See it on the map

LIMON GENERATING STATION, a 154 MW Natural Gas power plant in Lincoln County, Colorado. Operated by TRI-STATE G & T ASSN, INC, commissioned 2002.

How LIMON GENERATING STATION compares

With 154 MW of capacity, LIMON GENERATING STATION ranks 32nd among the 114 operating power plants Bywatts maps in Colorado and 11th of the 21 operating Natural Gas plants in the state. It accounts for about 2.8% of Colorado's operating Natural Gas capacity and 1.0% of all operating capacity in the state. Nationally it is the 599th-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 2002, it is newer than 61% of the 111 operating Colorado plants with a recorded commissioning year. Its operator, TRI-STATE G & T ASSN, INC, runs 5 operating plants in Colorado totaling 2,252 MW. It shares Lincoln County with 3 other operating plants, including CEDAR POINT WIND and LIMON WIND I.

EIA-860 lists 2 generators at the site with 154 MW of nameplate capacity, all natural gas fired combustion turbine technology. Net generation was 216 GWh in 2024 (a 16% capacity factor), up 96% from 2022.

Grid neighborhood

The nearest named substation is LINCOLN (230 kV), about 0.1 miles away; the closest transmission line found within 10 miles is a 230 kV line owned by TRI-STATE G & T ASSN, INC, under 0.1 miles away. Another 3 operating power plants totaling 652 MW sit within 25 miles; the largest is CEDAR POINT WIND (252 MW, Wind).

Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

LIMON GENERATING STATION is a 154 MW natural gas power plant in Lincoln County, CO, operated by TRI-STATE G & T ASSN, INC, commissioned in 2002. Lincoln County carries critical modeled catastrophe exposure in the FEMA National Risk Index, scoring 4.6 of 5 at the 91st national percentile. Hail is the leading peril, rated Relatively Low by FEMA at the 92nd percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

4.6 of 5Modeled catastrophe exposure
CriticalExposure band
HailLeading peril
Very LowFEMA county risk rating

Lincoln County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HailRelatively Low92nd4.7 of 56.3
TornadoVery Low87th4.5 of 52.6
Riverine floodingVery Low86th4.4 of 50.61
WildfireVery Low74th4.0 of 5<0.01
Strong windRelatively Low71st3.8 of 51.4
Winter weatherRelatively Low71st3.8 of 59.5
EarthquakeVery Low37th2.5 of 5<0.01
Ice stormVery Low30th2.2 of 50.03
LightningVery Low20th1.8 of 550.1
Heat waveVery Low16th1.6 of 50.34

Perils not assessed in Lincoln County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
HurricaneFEMA rating is "Not Applicable" for this county
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Lincoln County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.