NEW HAVEN HARBOR

Operating

Oil power plant

Capacity
642 MW
Primary fuel
Oil
County
South Central Connecticut Planning Region
Operator
PSEG POWER CONNECTICUT LLC
Status
Operating
Commissioned
1975
EIA plant ID
6156
Generators
4
Technology
Petroleum Liquids
Net generation (2024)
32.5 GWh
Capacity factor (2024, EIA nameplate)
0.6%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
41.2840, -72.9043

See it on the map

NEW HAVEN HARBOR, a 642 MW Oil power plant in South Central Connecticut Planning Region, Connecticut.

How NEW HAVEN HARBOR compares

With 642 MW of capacity, NEW HAVEN HARBOR ranks 5th among the 68 operating power plants Bywatts maps in Connecticut and is the largest of the 10 operating Oil plants in the state. It accounts for about 39% of Connecticut's operating Oil capacity and 6.9% of all operating capacity in the state. Nationally it is the 9th-largest of the 544 operating Oil plants in the database. Commissioned in 1975, it is older than 71% of the 66 operating Connecticut plants with a recorded commissioning year. Its operator, PSEG POWER CONNECTICUT LLC, runs 2 operating plants in Connecticut totaling 1,223 MW. It shares South Central Connecticut Planning Region with 7 other operating plants, including MILFORD POWER PROJECT and WALLINGFORD ENERGY.

EIA-860 lists 4 generators at the site with 642 MW of nameplate capacity, all petroleum liquids technology. Net generation was 32.5 GWh in 2024 (a 0.6% capacity factor). Its generators came online between 1975 and 2012.

Grid neighborhood

The nearest named substation is NEW HAVEN HARBOR (345 kV), about 0.3 miles away; the closest transmission line found within 10 miles is a 115 kV line, under 0.1 miles away. Another 21 operating power plants totaling 4,350 MW sit within 25 miles; the largest is KLEEN ENERGY SYSTEMS PROJECT (693 MW). Within 50 miles are 2 mapped data centers; the nearest is Crown Castle Brentwood (1650 Islip) in Brentwood, about 38.2 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

NEW HAVEN HARBOR is a 642 MW oil power plant in South Central Connecticut Planning Region, CT, operated by PSEG POWER CONNECTICUT LLC, commissioned in 1975. South Central Connecticut Planning Region carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.3 of 5 at the 32nd national percentile. Hurricane is the leading peril, rated Relatively High by FEMA at the 86th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to an oil plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.3 of 5Modeled catastrophe exposure
ModerateExposure band
HurricaneLeading peril
Relatively HighFEMA county risk rating

South Central Connecticut Planning Region hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HurricaneRelatively High86th4.5 of 50.17
Coastal floodingRelatively High82nd4.3 of 55.0
Ice stormVery High70th3.8 of 52.0
EarthquakeRelatively Moderate64th3.5 of 5<0.01
Riverine floodingRelatively High60th3.4 of 53.3
WildfireVery Low28th2.1 of 5<0.01
Winter weatherRelatively High26th2.0 of 512.8
TornadoRelatively Moderate22nd1.9 of 50.17
Strong windRelatively High17th1.7 of 53.4
LightningRelatively High7th1.3 of 526.1
Heat waveRelatively Moderate7th1.3 of 55.0
HailRelatively Low5th1.2 of 52.3

Model hail, wind and flood exposure for South Central Connecticut Planning Region in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.