BRIDGEPORT ENERGY PROJECT

Operating

Natural Gas power plant

Capacity
520 MW
Primary fuel
Natural Gas
County
Greater Bridgeport Planning Region
Operator
BRIDGEPORT ENERGY LLC
Status
Operating
Commissioned
1998
EIA plant ID
55042
Generators
3
Technology
Natural Gas Fired Combined Cycle
Net generation (2024)
2,650 GWh
Capacity factor (2024, EIA nameplate)
58%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
41.1692, -73.1844

See it on the map

BRIDGEPORT ENERGY PROJECT, a 520 MW Natural Gas power plant in Greater Bridgeport Planning Region, Connecticut.

How BRIDGEPORT ENERGY PROJECT compares

With 520 MW of capacity, BRIDGEPORT ENERGY PROJECT ranks 8th among the 68 operating power plants Bywatts maps in Connecticut and 4th of the 13 operating Natural Gas plants in the state. It accounts for about 16% of Connecticut's operating Natural Gas capacity and 5.6% of all operating capacity in the state. Nationally it is the 319th-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1998, it is older than 50% of the 66 operating Connecticut plants with a recorded commissioning year. It shares Greater Bridgeport Planning Region with 4 other operating plants, including BRIDGEPORT STATION and WHEELABRATOR BRIDGEPORT.

EIA-860 lists 3 generators at the site with 520 MW of nameplate capacity, all natural gas fired combined cycle technology. Net generation was 2,650 GWh in 2024 (a 58% capacity factor), up 3% from 2022. Its generators came online between 1998 and 1999.

Grid neighborhood

The nearest named substation is BRIDGEPORT RESCO, about 0.1 miles away; the closest transmission line found within 10 miles is a 345 kV line, under 0.1 miles away. Another 23 operating power plants totaling 5,180 MW sit within 25 miles; the largest is NORTHPORT (1,564 MW, Natural Gas). Within 50 miles are 4 mapped data centers; the nearest is Crown Castle Brentwood (1650 Islip) in Brentwood, about 26.7 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

BRIDGEPORT ENERGY PROJECT is a 520 MW natural gas power plant in Greater Bridgeport Planning Region, CT, operated by BRIDGEPORT ENERGY LLC, commissioned in 1998. Greater Bridgeport Planning Region carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.4 of 5 at the 35th national percentile. Hurricane is the leading peril, rated Relatively High by FEMA at the 87th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.4 of 5Modeled catastrophe exposure
ModerateExposure band
HurricaneLeading peril
Relatively ModerateFEMA county risk rating

Greater Bridgeport Planning Region hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HurricaneRelatively High87th4.5 of 50.18
Coastal floodingVery High86th4.4 of 56.2
Riverine floodingRelatively High66th3.6 of 53.5
EarthquakeRelatively Low61st3.4 of 5<0.01
Ice stormRelatively High51st3.0 of 51.4
WildfireVery Low28th2.1 of 5<0.01
Winter weatherRelatively High26th2.0 of 512.9
Strong windRelatively High25th2.0 of 54.1
TornadoRelatively Low15th1.6 of 50.07
HailVery Low2nd1.1 of 52.1
Heat waveRelatively Low1st1.0 of 55.5
LightningRelatively Moderate1st1.0 of 526.1

Model hail, wind and flood exposure for Greater Bridgeport Planning Region in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.