PLANT MCDONOUGH
OperatingCoal power plant
- Capacity
- 2,604 MW
- Primary fuel
- Coal
- County
- Cobb County
- Operator
- GEORGIA POWER CO
- Status
- Operating
- Commissioned
- 1971
- EIA plant ID
- 710
- Generators
- 11
- Net generation (2024)
- 17,987 GWh
- Capacity factor (2024, EIA nameplate)
- 72%
- Data vintage
- EIA-860 2024 final; EIA-923 2022-2024 final
- Coordinates
- 33.8238, -84.4757
PLANT MCDONOUGH, a 2,604 MW Coal power plant in Cobb County, Georgia. Operated by GEORGIA POWER CO, commissioned 1971.
How PLANT MCDONOUGH compares
With 2,604 MW of capacity, PLANT MCDONOUGH ranks 3rd among the 104 operating power plants Bywatts maps in Georgia and 3rd of the 5 operating Coal plants in the state. It accounts for about 23% of Georgia's operating Coal capacity and 7.3% of all operating capacity in the state. Nationally it is the 11th-largest of the 324 operating Coal plants in the database. Commissioned in 1971, it is older than 67% of the 101 operating Georgia plants with a recorded commissioning year. Its operator, GEORGIA POWER CO, runs 24 operating plants in Georgia totaling 19,021 MW. It shares Cobb County with one other operating plant, RIVERWOOD 100 BUILDING.
Under the same EIA plant code, EIA-860 lists 11 generators at the site with 2,848 MW of nameplate capacity. Net generation was 17,987 GWh in 2024 (a 72% capacity factor), down 2% from 2022. Its generators came online between 1971 and 2012.
Grid neighborhood
The closest transmission line found within 10 miles is a 230 kV line owned by GEORGIA POWER CO, under 0.1 miles away. Another 15 operating power plants totaling 67 MW sit within 25 miles; the largest is MORGAN FALLS DAM (17 MW, Hydro). Within 50 miles are 9 mapped data centers; the nearest is QTS Atlanta-Metro (ATL1) in Atlanta, about 4.5 miles away.
Computed by Bywatts from HIFLD power plant and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology
Weather peril exposure
PLANT MCDONOUGH is a 2,604 MW coal power plant in Cobb County, GA, operated by GEORGIA POWER CO, commissioned in 1971. Cobb County carries elevated modeled catastrophe exposure in the FEMA National Risk Index, scoring 3.0 of 5 at the 51st national percentile. Lightning is the leading peril, rated Very High by FEMA at the 74th percentile.
The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a coal plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.
Cobb County hazard ratings
| Peril | FEMA rating | National percentile | Peril score | Events per year |
|---|---|---|---|---|
| Lightning | Very High | 74th | 4.0 of 5 | 62.3 |
| Earthquake | Relatively Moderate | 66th | 3.6 of 5 | <0.01 |
| Tornado | Relatively High | 63rd | 3.5 of 5 | 0.21 |
| Hail | Relatively High | 61st | 3.4 of 5 | 5.6 |
| Ice storm | Relatively High | 60th | 3.4 of 5 | 1.2 |
| Hurricane | Relatively Low | 39th | 2.6 of 5 | 0.04 |
| Riverine flooding | Relatively High | 37th | 2.5 of 5 | 1.3 |
| Wildfire | Very Low | 28th | 2.1 of 5 | <0.01 |
| Winter weather | Relatively Moderate | 17th | 1.7 of 5 | 2.8 |
| Heat wave | Relatively Moderate | 17th | 1.7 of 5 | 2.2 |
| Strong wind | Relatively Moderate | 15th | 1.6 of 5 | 2.8 |
Perils not assessed in Cobb County
These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.
| Peril | Why it is not scored |
|---|---|
| Coastal flooding | FEMA rating is "Not Applicable" for this county |
Model hail, wind and flood exposure for Cobb County in the weather risk calculator
Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.
Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.