WANSLEY COMBINED CYCLE

Operating

Natural Gas power plant

Capacity
1,239 MW
Primary fuel
Natural Gas
County
Heard County
Operator
SOUTHERN POWER CO
Status
Operating
Commissioned
2002
EIA plant ID
55965
Generators
6
Technology
Natural Gas Fired Combined Cycle
Net generation (2024)
7,831 GWh
Capacity factor (2024, EIA nameplate)
72%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
33.4066, -85.0372

See it on the map

WANSLEY COMBINED CYCLE, a 1,239 MW Natural Gas power plant in Heard County, Georgia. Operated by SOUTHERN POWER CO, commissioned 2002.

How WANSLEY COMBINED CYCLE compares

With 1,239 MW of capacity, WANSLEY COMBINED CYCLE ranks 7th among the 104 operating power plants Bywatts maps in Georgia and is the largest of the 26 operating Natural Gas plants in the state. It accounts for about 8.4% of Georgia's operating Natural Gas capacity and 3.5% of all operating capacity in the state. Nationally it is the 53rd-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 2002, it is newer than 81% of the 101 operating Georgia plants with a recorded commissioning year. Its operator, SOUTHERN POWER CO, runs 3 operating plants in Georgia totaling 2,859 MW. It shares Heard County with 4 other operating plants, including TENASKA GEORGIA GENERATION FACILITY and WANSLEY UNIT 9.

EIA-860 lists 6 generators at the site with 1,239 MW of nameplate capacity, all natural gas fired combined cycle technology. Net generation was 7,831 GWh in 2024 (a 72% capacity factor), down 13% from 2022.

Grid neighborhood

The closest transmission line found within 10 miles is a 500 kV line owned by GEORGIA POWER CO, under 0.1 miles away. Another 5 operating power plants totaling 4,189 MW sit within 25 miles; the largest is PLANT YATES (1,487 MW, Coal). Within 50 miles are 8 mapped data centers; the nearest is QTS Atlanta-Metro (ATL1) in Atlanta, about 43.8 miles away.

Computed by Bywatts from HIFLD power plant and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

WANSLEY COMBINED CYCLE is a 1,239 MW natural gas power plant in Heard County, GA, operated by SOUTHERN POWER CO, commissioned in 2002. Heard County carries elevated modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.9 of 5 at the 46th national percentile. Lightning is the leading peril, rated Relatively Low by FEMA at the 95th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.9 of 5Modeled catastrophe exposure
ElevatedExposure band
LightningLeading peril
Very LowFEMA county risk rating

Heard County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
LightningRelatively Low95th4.8 of 561.7
TornadoRelatively Low81st4.2 of 50.22
Ice stormRelatively Low72nd3.9 of 50.79
WildfireVery Low61st3.4 of 5<0.01
HailVery Low55th3.2 of 55.1
EarthquakeVery Low55th3.2 of 5<0.01
HurricaneVery Low51st3.0 of 50.06
Strong windRelatively Low41st2.7 of 52.5
Riverine floodingVery Low28th2.1 of 50.32
Heat waveVery Low18th1.7 of 52.7
Winter weatherVery Low15th1.6 of 51.7

Perils not assessed in Heard County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Heard County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.