ROBBINS LUMBER

Operating

Biomass power plant

Capacity
3 MW
Primary fuel
Biomass
County
Waldo County
Operator
ROBBINS LUMBER INC
Status
Operating
Commissioned
1981
EIA plant ID
50230
Coordinates
44.3334, -69.2011

See it on the map

ROBBINS LUMBER, a 3 MW Biomass power plant in Waldo County, Maine. Operated by ROBBINS LUMBER INC, commissioned 1981.

Weather peril exposure

ROBBINS LUMBER is a 3 MW biomass power plant in Waldo County, ME, operated by ROBBINS LUMBER INC, commissioned in 1981. Waldo County carries elevated modeled catastrophe exposure in the FEMA National Risk Index, scoring 3.1 of 5 at the 53rd national percentile. Winter weather is the leading peril, rated Relatively High by FEMA at the 97th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a biomass plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

3.1 of 5Modeled catastrophe exposure
ElevatedExposure band
Winter weatherLeading peril
Very LowFEMA county risk rating

Waldo County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Winter weatherRelatively High97th4.9 of 531.9
Coastal floodingRelatively Low94th4.8 of 510.6
Ice stormRelatively High93rd4.7 of 51.3
HurricaneRelatively Moderate87th4.5 of 50.09
LightningRelatively Moderate79th4.1 of 515.0
EarthquakeVery Low42nd2.7 of 5<0.01
HailVery Low30th2.2 of 50.72
Riverine floodingRelatively Low16th1.7 of 50.79
TornadoVery Low11th1.4 of 50.03
Strong windRelatively Low5th1.2 of 50.69
Heat waveVery Low4th1.2 of 51.8
WildfireVery Low2nd1.1 of 5<0.01

Model hail, wind and flood exposure for Waldo County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.