PERRYMAN

Operating

Natural Gas power plant

Capacity
404 MW
Primary fuel
Natural Gas
County
Harford County
Operator
CONSTELLATION POWER SOURCE GEN
Status
Operating
Commissioned
1972
EIA plant ID
1556
Generators
5
Technology
Natural Gas Fired Combustion Turbine
Net generation (2024)
152 GWh
Capacity factor (2024, EIA nameplate)
3.5%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
39.4428, -76.2218

See it on the map

PERRYMAN, a 404 MW Natural Gas power plant in Harford County, Maryland. Operated by CONSTELLATION POWER SOURCE GEN, commissioned 1972.

How PERRYMAN compares

With 404 MW of capacity, PERRYMAN ranks 8th among the 48 operating power plants Bywatts maps in Maryland and 2nd of the 7 operating Natural Gas plants in the state. It accounts for about 26% of Maryland's operating Natural Gas capacity and 3.8% of all operating capacity in the state. Nationally it is the 376th-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1972, it is older than 76% of the 46 operating Maryland plants with a recorded commissioning year. Its operator, CONSTELLATION POWER SOURCE GEN, runs 2 operating plants in Maryland totaling 487 MW. It shares Harford County with 2 other operating plants, CONOWINGO and MCCORMICK & CO. INC. AT BELCAMP.

EIA-860 lists 5 generators at the site with 492 MW of nameplate capacity, mainly natural gas fired combustion turbine technology (this page's HIFLD capacity figure is 404 MW). Net generation was 152 GWh in 2024 (a 3.5% capacity factor), down 54% from 2022. Its generators came online between 1972 and 2015.

Grid neighborhood

The nearest named substation is PEACH BOTTOM (500 kV), about 22.2 miles away; the closest transmission line found within 10 miles is a 115 kV line owned by BALTIMORE GAS & ELECTRIC CO, under 0.1 miles away. Another 15 operating power plants totaling 6,786 MW sit within 25 miles; the largest is PEACH BOTTOM (2,319 MW, Nuclear). Within 50 miles are 3 mapped data centers; the nearest is Lumen Baltimore in Baltimore, about 23.7 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

PERRYMAN is a 404 MW natural gas power plant in Harford County, MD, operated by CONSTELLATION POWER SOURCE GEN, commissioned in 1972. Harford County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.2 of 5 at the 5th national percentile. Hurricane is the leading peril, rated Relatively Moderate by FEMA at the 73rd percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.2 of 5Modeled catastrophe exposure
LowExposure band
HurricaneLeading peril
Relatively LowFEMA county risk rating

Harford County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HurricaneRelatively Moderate73rd3.9 of 50.08
EarthquakeRelatively Low55th3.2 of 5<0.01
Winter weatherRelatively High53rd3.1 of 512.7
Coastal floodingRelatively Low51st3.1 of 53.7
Strong windRelatively Moderate39th2.5 of 57.4
LightningRelatively Moderate34th2.4 of 536.3
TornadoRelatively Low19th1.8 of 50.35
Riverine floodingRelatively Moderate11th1.4 of 52.9
WildfireVery Low10th1.4 of 5<0.01
Ice stormRelatively Low7th1.3 of 51.1
HailVery Low4th1.2 of 53.0
Heat waveRelatively Moderate1st1.0 of 55.0

Model hail, wind and flood exposure for Harford County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.