MASSPOWER

Operating

Natural Gas power plant

Capacity
261 MW
Primary fuel
Natural Gas
County
Hampden County
Operator
MASSPOWER
Status
Operating
Commissioned
1993
EIA plant ID
10726
Generators
3
Technology
Natural Gas Fired Combined Cycle
Net generation (2024)
476 GWh
Capacity factor (2024, EIA nameplate)
21%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
42.1576, -72.5225

See it on the map

MASSPOWER, a 261 MW Natural Gas power plant in Hampden County, Massachusetts. Operated by MASSPOWER, commissioned 1993.

How MASSPOWER compares

With 261 MW of capacity, MASSPOWER ranks 12th among the 125 operating power plants Bywatts maps in Massachusetts and 9th of the 22 operating Natural Gas plants in the state. It accounts for about 4.9% of Massachusetts's operating Natural Gas capacity and 2.8% of all operating capacity in the state. Nationally it is the 494th-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1993, it is older than 50% of the 122 operating Massachusetts plants with a recorded commissioning year. It shares Hampden County with 19 other operating plants, including STONY BROOK and BERKSHIRE POWER.

EIA-860 lists 3 generators at the site with 261 MW of nameplate capacity, all natural gas fired combined cycle technology. Net generation was 476 GWh in 2024 (a 21% capacity factor), about 2 times its 2022 output.

Grid neighborhood

The nearest named substation is SCITICO, about 12.4 miles away; the closest transmission line found within 10 miles is a 115 kV line, about 0.4 miles away. Another 26 operating power plants totaling 1,041 MW sit within 25 miles; the largest is STONY BROOK (535 MW, Natural Gas).

Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

MASSPOWER is a 261 MW natural gas power plant in Hampden County, MA, operated by MASSPOWER, commissioned in 1993. Hampden County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.6 of 5 at the 14th national percentile. Hurricane is the leading peril, rated Relatively High by FEMA at the 80th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.6 of 5Modeled catastrophe exposure
LowExposure band
HurricaneLeading peril
Relatively ModerateFEMA county risk rating

Hampden County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HurricaneRelatively High80th4.2 of 50.11
Ice stormRelatively High68th3.7 of 52.3
EarthquakeRelatively Moderate63rd3.5 of 5<0.01
Riverine floodingRelatively High60th3.4 of 52.8
Winter weatherRelatively Moderate39th2.5 of 517.5
TornadoRelatively Moderate29th2.2 of 50.19
WildfireVery Low21st1.8 of 5<0.01
Strong windRelatively High15th1.6 of 51.8
HailRelatively Moderate14th1.6 of 52.9
LightningRelatively Moderate11th1.4 of 526.5
Heat waveRelatively Moderate7th1.3 of 55.1

Perils not assessed in Hampden County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Hampden County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.