POTTER STATION 2
OperatingNatural Gas power plant
- Capacity
- 220 MW
- Primary fuel
- Natural Gas
- County
- Norfolk County
- Operator
- TOWN OF BRAINTREE - (MA)
- Status
- Operating
- Commissioned
- 2009
- EIA plant ID
- 1660
- Generators
- 2
- Technology
- Natural Gas Fired Combustion Turbine
- Net generation (2024)
- 23.3 GWh
- Data vintage
- EIA-860 2024 final; EIA-923 2022-2024 final
- Coordinates
- 42.2348, -70.9673
POTTER STATION 2, a 220 MW Natural Gas power plant in Norfolk County, Massachusetts. Operated by TOWN OF BRAINTREE - (MA), commissioned 2009.
How POTTER STATION 2 compares
With 220 MW of capacity, POTTER STATION 2 ranks 13th among the 125 operating power plants Bywatts maps in Massachusetts and 10th of the 22 operating Natural Gas plants in the state. It accounts for about 4.1% of Massachusetts's operating Natural Gas capacity and 2.4% of all operating capacity in the state. Nationally it is the 533rd-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 2009, it is newer than 60% of the 122 operating Massachusetts plants with a recorded commissioning year. It shares Norfolk County with 8 other operating plants, including FORE RIVER GENERATING STATION and ANP BELLINGHAM ENERGY PROJECT.
EIA-860 lists 2 generators at the site with 116 MW of nameplate capacity, all natural gas fired combustion turbine technology (this page's HIFLD capacity figure is 220 MW). Net generation was 23.3 GWh in 2024.
Grid neighborhood
The closest transmission line found within 10 miles is a 115 kV line, under 0.1 miles away. Another 20 operating power plants totaling 1,712 MW sit within 25 miles; the largest is FORE RIVER GENERATING STATION (872 MW, Natural Gas). Within 50 miles are 4 mapped data centers; the nearest is Markley Group One Summer Street Boston in Boston, about 9.5 miles away.
Computed by Bywatts from HIFLD power plant and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology
Weather peril exposure
POTTER STATION 2 is a 220 MW natural gas power plant in Norfolk County, MA, operated by TOWN OF BRAINTREE - (MA), commissioned in 2009. Norfolk County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.4 of 5 at the 10th national percentile. Hurricane is the leading peril, rated Relatively Moderate by FEMA at the 77th percentile.
The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.
Norfolk County hazard ratings
| Peril | FEMA rating | National percentile | Peril score | Events per year |
|---|---|---|---|---|
| Hurricane | Relatively Moderate | 77th | 4.1 of 5 | 0.18 |
| Coastal flooding | Relatively High | 75th | 4.0 of 5 | 7.9 |
| Earthquake | Relatively Moderate | 64th | 3.6 of 5 | <0.01 |
| Ice storm | Relatively High | 50th | 3.0 of 5 | 1.8 |
| Lightning | Relatively High | 33rd | 2.3 of 5 | 21.0 |
| Wildfire | Very Low | 25th | 2.0 of 5 | <0.01 |
| Riverine flooding | Relatively High | 22nd | 1.9 of 5 | 2.9 |
| Tornado | Relatively Moderate | 18th | 1.7 of 5 | 0.08 |
| Winter weather | Relatively Low | 14th | 1.6 of 5 | 13.0 |
| Strong wind | Relatively Moderate | 13th | 1.5 of 5 | 0.92 |
| Heat wave | Relatively Moderate | 7th | 1.3 of 5 | 6.1 |
| Hail | Very Low | 3rd | 1.1 of 5 | 1.8 |
Model hail, wind and flood exposure for Norfolk County in the weather risk calculator
Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.
Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.