COLLEGE OF NEW JERSEY

Operating

Power plant

Capacity
6 MW
County
Mercer County
Operator
THE COLLEGE OF NEW JERSEY
Status
Operating
Commissioned
1996
EIA plant ID
58165
Coordinates
40.2695, -74.7732

See it on the map

COLLEGE OF NEW JERSEY, a 6 MW power plant in Mercer County, New Jersey. Operated by THE COLLEGE OF NEW JERSEY, commissioned 1996.

Weather peril exposure

COLLEGE OF NEW JERSEY is a 6 MW power plant in Mercer County, NJ, operated by THE COLLEGE OF NEW JERSEY, commissioned in 1996. Mercer County carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.4 of 5 at the 36th national percentile. Strong wind is the leading peril, rated Very High by FEMA at the 91st percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to this plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.4 of 5Modeled catastrophe exposure
ModerateExposure band
Strong windLeading peril
Relatively HighFEMA county risk rating

Mercer County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Strong windVery High91st4.6 of 57.0
Coastal floodingRelatively Low90th4.6 of 56.2
HurricaneRelatively High83rd4.3 of 50.11
Riverine floodingRelatively High79th4.2 of 53.6
EarthquakeRelatively Moderate77th4.1 of 5<0.01
Ice stormVery High73rd3.9 of 51.1
Winter weatherVery High52nd3.1 of 510.6
WildfireRelatively Low50th3.0 of 5<0.01
LightningRelatively High32nd2.3 of 533.6
TornadoRelatively Moderate20th1.8 of 50.09
HailVery Low8th1.3 of 52.4
Heat waveRelatively Moderate2nd1.1 of 511.0

Model hail, wind and flood exposure for Mercer County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.