PAULSBORO REFINERY

Operating

Natural Gas power plant

Capacity
75 MW
Primary fuel
Natural Gas
County
Gloucester County
Operator
PAULSBORO REFINING COMPANY - LLC
Status
Operating
Commissioned
1982
EIA plant ID
50628
Generators
4
Largest technology
Natural Gas Fired Combustion Turbine
Net generation (2024)
352 GWh
Capacity factor (2024, EIA nameplate)
51%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
39.8394, -75.2568

See it on the map

PAULSBORO REFINERY, a 75 MW Natural Gas power plant in Gloucester County, New Jersey. Operated by PAULSBORO REFINING COMPANY - LLC, commissioned 1982.

How PAULSBORO REFINERY compares

With 75 MW of capacity, PAULSBORO REFINERY ranks 22nd among the 130 operating power plants Bywatts maps in New Jersey and 16th of the 25 operating Natural Gas plants in the state. It accounts for about 0.9% of New Jersey's operating Natural Gas capacity and 0.5% of all operating capacity in the state. Nationally it is the 740th-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1982, it is older than 92% of the 128 operating New Jersey plants with a recorded commissioning year. It shares Gloucester County with 4 other operating plants, including EAGLE POINT POWER GENERATION and WHEELABRATOR GLOUCESTER LP.

EIA-860 lists 4 generators at the site with 79 MW of nameplate capacity, led by natural gas fired combustion turbine technology. Net generation was 352 GWh in 2024 (a 51% capacity factor), up 24% from 2022. Its generators came online between 1982 and 2006.

Grid neighborhood

The nearest named substation is EDDYSTONE (230 kV), about 3.9 miles away; the closest transmission line found within 10 miles is a 230 kV line, about 1.5 miles away. Another 34 operating power plants totaling 5,531 MW sit within 25 miles; the largest is HAY ROAD (1,193 MW, Natural Gas). Within 50 miles are 4 mapped data centers; the nearest is Quonix Datacenter (2401 Locust St) in Philadelphia, about 8.7 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

PAULSBORO REFINERY is a 75 MW natural gas power plant in Gloucester County, NJ, operated by PAULSBORO REFINING COMPANY - LLC, commissioned in 1982. Gloucester County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.7 of 5 at the 17th national percentile. Coastal flooding is the leading peril, rated Relatively High by FEMA at the 88th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.7 of 5Modeled catastrophe exposure
LowExposure band
Coastal floodingLeading peril
Relatively ModerateFEMA county risk rating

Gloucester County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Coastal floodingRelatively High88th4.5 of 53.7
EarthquakeRelatively Low74th4.0 of 5<0.01
Strong windRelatively High71st3.9 of 55.8
HurricaneRelatively Moderate68th3.7 of 50.11
Winter weatherVery High68th3.7 of 510.7
WildfireRelatively Low57th3.3 of 5<0.01
Ice stormRelatively High34th2.4 of 50.89
TornadoRelatively Moderate23rd1.9 of 50.15
LightningRelatively High22nd1.9 of 534.5
Riverine floodingRelatively Moderate17th1.7 of 52.6
HailRelatively Low3rd1.1 of 52.0
Heat waveRelatively Moderate2nd1.1 of 511.1

Model hail, wind and flood exposure for Gloucester County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.