BRUNSWICK

Operating

Nuclear power plant

Capacity
2,003 MW
Primary fuel
Nuclear
County
Brunswick County
Operator
PROGRESS ENERGY CAROLINAS INC
Status
Operating
Commissioned
1975
EIA plant ID
6014
Coordinates
33.9587, -78.0101

See it on the map

BRUNSWICK, a 2,003 MW Nuclear power plant in Brunswick County, North Carolina. Operated by PROGRESS ENERGY CAROLINAS INC, commissioned 1975.

Weather peril exposure

BRUNSWICK is a 2,003 MW nuclear power plant in Brunswick County, NC, operated by PROGRESS ENERGY CAROLINAS INC, commissioned in 1975. Brunswick County carries critical modeled catastrophe exposure in the FEMA National Risk Index, scoring 4.5 of 5 at the 89th national percentile. Hurricane is the leading peril, rated Very High by FEMA at the 99th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a nuclear plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

4.5 of 5Modeled catastrophe exposure
CriticalExposure band
HurricaneLeading peril
Relatively HighFEMA county risk rating

Brunswick County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HurricaneVery High99th5.0 of 50.37
Coastal floodingRelatively High74th4.0 of 53.7
WildfireRelatively Moderate68th3.7 of 5<0.01
LightningRelatively High67th3.7 of 556.8
Ice stormRelatively High63rd3.5 of 50.58
EarthquakeRelatively Low62nd3.5 of 5<0.01
Heat waveRelatively Moderate38th2.5 of 58.2
TornadoRelatively Moderate36th2.4 of 50.46
Riverine floodingRelatively Moderate32nd2.3 of 52.1
Winter weatherRelatively High30th2.2 of 51.6
HailVery Low12th1.5 of 52.2
Strong windRelatively Moderate7th1.3 of 51.7

Model hail, wind and flood exposure for Brunswick County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.