LEANING JUNIPER WIND POWER II

Operating

Wind power plant

Capacity
201 MW
Primary fuel
Wind
County
Gilliam County
Operator
IBERDROLA RENEWABLES INC
Status
Operating
Commissioned
2011
EIA plant ID
57333
Generators
1
Technology
Onshore Wind Turbine
Net generation (2024)
417 GWh
Capacity factor (2024, EIA nameplate)
24%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
45.6727, -120.2212

See it on the map

LEANING JUNIPER WIND POWER II, a 201 MW Wind power plant in Gilliam County, Oregon. Operated by IBERDROLA RENEWABLES INC, commissioned 2011.

How LEANING JUNIPER WIND POWER II compares

With 201 MW of capacity, LEANING JUNIPER WIND POWER II ranks 18th among the 130 operating power plants Bywatts maps in Oregon and 5th of the 33 operating Wind plants in the state. It accounts for about 7.0% of Oregon's operating Wind capacity and 1.3% of all operating capacity in the state. Nationally it is the 51st-largest of the 708 operating Wind plants in the database. Commissioned in 2011, it is newer than 86% of the 128 operating Oregon plants with a recorded commissioning year. Its operator, IBERDROLA RENEWABLES INC, runs 6 operating plants in Oregon totaling 606 MW. It shares Gilliam County with 9 other operating plants, including HORSESHOE BEND WIND LLC and SOUTH HURLBURT WIND LLC.

EIA-860 lists 1 generator at the site with 199 MW of nameplate capacity, all onshore wind turbine technology. Net generation was 417 GWh in 2024 (a 24% capacity factor), up 26% from 2022.

Grid neighborhood

The nearest named substation is JONES CANYON (230 kV), about 0.3 miles away; the closest transmission line found within 10 miles is a 230 kV line owned by BONNEVILLE POWER ADMINISTRATION, under 0.1 miles away. Another 25 operating power plants totaling 5,202 MW sit within 25 miles; the largest is JOHN DAY (2,160 MW, Hydro).

Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

LEANING JUNIPER WIND POWER II is a 201 MW wind power plant in Gilliam County, OR, operated by IBERDROLA RENEWABLES INC, commissioned in 2011. Gilliam County carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.0 of 5 at the 24th national percentile. Wildfire is the leading peril, rated Relatively Low by FEMA at the 98th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a wind plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.0 of 5Modeled catastrophe exposure
ModerateExposure band
WildfireLeading peril
Very LowFEMA county risk rating

Gilliam County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
WildfireRelatively Low98th4.9 of 50.01
Riverine floodingVery Low83rd4.3 of 50.07
EarthquakeVery Low73rd3.9 of 5<0.01
Heat waveVery Low64th3.5 of 55.0
Strong windVery Low53rd3.1 of 50.17
HailVery Low24th2.0 of 50.22
LightningRelatively Low18th1.7 of 58.8
Winter weatherVery Low8th1.3 of 510.0
TornadoVery Low3rd1.1 of 50.02
Ice stormVery Low2nd1.1 of 50.02

Perils not assessed in Gilliam County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
HurricaneFEMA rating is "Not Applicable" for this county
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Gilliam County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.