EDDYSTONE GENERATING STATION

Operating

Coal power plant

Capacity
862 MW
Primary fuel
Coal
County
Delaware County
Operator
EXELON POWER
Status
Operating
Commissioned
1967
EIA plant ID
3161
Generators
6
Net generation (2024)
60.8 GWh
Capacity factor (2024, EIA nameplate)
0.8%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
39.8593, -75.3242

See it on the map

EDDYSTONE GENERATING STATION, an 862 MW Coal power plant in Delaware County, Pennsylvania. Operated by EXELON POWER, commissioned 1967.

How EDDYSTONE GENERATING STATION compares

With 862 MW of capacity, EDDYSTONE GENERATING STATION ranks 15th among the 170 operating power plants Bywatts maps in Pennsylvania and 5th of the 20 operating Coal plants in the state. It accounts for about 8.2% of Pennsylvania's operating Coal capacity and 2.2% of all operating capacity in the state. Nationally it is the 120th-largest of the 324 operating Coal plants in the database. Commissioned in 1967, it is older than 88% of the 168 operating Pennsylvania plants with a recorded commissioning year. Its operator, EXELON POWER, runs 11 operating plants in Pennsylvania totaling 2,992 MW. It shares Delaware County with 4 other operating plants, including FPL ENERGY MARCUS HOOK LP and LIBERTY ELECTRIC POWER PLANT.

Under the same EIA plant code, EIA-860 lists 6 generators at the site with 862 MW of nameplate capacity. Net generation was 60.8 GWh in 2024 (a 0.8% capacity factor). Its generators came online between 1967 and 1976.

Grid neighborhood

The nearest named substation is EDDYSTONE (230 kV), about 0.1 miles away; the closest transmission line found within 10 miles is a 230 kV line owned by PECO ENERGY CO, under 0.1 miles away. Another 36 operating power plants totaling 5,168 MW sit within 25 miles; the largest is HAY ROAD (1,193 MW, Natural Gas). Within 50 miles are 4 mapped data centers; the nearest is Quonix Datacenter (2401 Locust St) in Philadelphia, about 9.9 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

EDDYSTONE GENERATING STATION is an 862 MW coal power plant in Delaware County, PA, operated by EXELON POWER, commissioned in 1967. Delaware County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.1 of 5 at the 4th national percentile. Earthquake is the leading peril, rated Relatively Moderate by FEMA at the 75th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a coal plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.1 of 5Modeled catastrophe exposure
LowExposure band
EarthquakeLeading peril
Relatively ModerateFEMA county risk rating

Delaware County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
EarthquakeRelatively Moderate75th4.0 of 5<0.01
HurricaneRelatively Moderate67th3.7 of 50.09
Winter weatherVery High66th3.6 of 510.5
Coastal floodingRelatively Moderate50th3.0 of 53.7
Strong windRelatively High38th2.5 of 56.9
Ice stormRelatively High35th2.4 of 51.4
TornadoRelatively High30th2.2 of 50.10
WildfireVery Low24th2.0 of 5<0.01
LightningRelatively High19th1.8 of 536.0
Riverine floodingRelatively High14th1.6 of 54.6
Heat waveRelatively High8th1.3 of 511.1
HailVery Low4th1.2 of 52.5

Model hail, wind and flood exposure for Delaware County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.