V C SUMMER

Operating

Nuclear power plant

Capacity
1,030 MW
Primary fuel
Nuclear
County
Fairfield County
Operator
SOUTH CAROLINA ELECTRIC&GAS CO
Status
Operating
Commissioned
1984
EIA plant ID
6127
Generators
1
Technology
Nuclear
Net generation (2024)
7,421 GWh
Capacity factor (2024, EIA nameplate)
82%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
34.2979, -81.3151

See it on the map

V C SUMMER, a 1,030 MW Nuclear power plant in Fairfield County, South Carolina. Operated by SOUTH CAROLINA ELECTRIC&GAS CO, commissioned 1984.

How V C SUMMER compares

With 1,030 MW of capacity, V C SUMMER ranks 7th among the 83 operating power plants Bywatts maps in South Carolina and 3rd of the 4 operating Nuclear plants in the state. It accounts for about 15% of South Carolina's operating Nuclear capacity and 4.4% of all operating capacity in the state. Nationally it is the 46th-largest of the 55 operating Nuclear plants in the database. Commissioned in 1984, it is older than 52% of the 82 operating South Carolina plants with a recorded commissioning year. Its operator, SOUTH CAROLINA ELECTRIC&GAS CO, runs 12 operating plants in South Carolina totaling 5,236 MW. It shares Fairfield County with 2 other operating plants, FAIRFIELD PUMPED STORAGE and PARR HYDRO.

EIA-860 lists 1 generator at the site with 1,030 MW of nameplate capacity, all nuclear technology. Net generation was 7,421 GWh in 2024 (an 82% capacity factor), down 14% from 2022.

Grid neighborhood

The closest transmission line found within 10 miles is a 230 kV line, under 0.1 miles away. Another 5 operating power plants totaling 1,032 MW sit within 25 miles; the largest is FAIRFIELD PUMPED STORAGE (511 MW, Hydro).

Computed by Bywatts from HIFLD power plant and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

V C SUMMER is a 1,030 MW nuclear power plant in Fairfield County, SC, operated by SOUTH CAROLINA ELECTRIC&GAS CO, commissioned in 1984. Fairfield County carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.2 of 5 at the 30th national percentile. Ice storm is the leading peril, rated Relatively High by FEMA at the 85th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a nuclear plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.2 of 5Modeled catastrophe exposure
ModerateExposure band
Ice stormLeading peril
Very LowFEMA county risk rating

Fairfield County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Ice stormRelatively High85th4.4 of 51.9
HurricaneRelatively Low80th4.2 of 50.14
EarthquakeRelatively Low78th4.1 of 5<0.01
TornadoRelatively Moderate63rd3.5 of 50.50
LightningRelatively Low50th3.0 of 555.2
Riverine floodingRelatively Low47th2.9 of 50.14
WildfireVery Low44th2.8 of 5<0.01
Strong windRelatively Low38th2.5 of 55.3
HailVery Low29th2.2 of 54.3
Heat waveRelatively Low20th1.8 of 52.9
Winter weatherVery Low11th1.4 of 52.3

Perils not assessed in Fairfield County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Fairfield County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.