GOAT WIND LP

Operating

Wind power plant

Capacity
150 MW
Primary fuel
Wind
County
Sterling County
Operator
EDISON MISSION ENERGY
Status
Operating
Commissioned
2008
EIA plant ID
56754
Generators
2
Technology
Onshore Wind Turbine
Net generation (2024)
223 GWh
Capacity factor (2024, EIA nameplate)
17%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
29.5531, -95.6650

See it on the map

GOAT WIND LP, a 150 MW Wind power plant in Sterling County, Texas. Operated by EDISON MISSION ENERGY, commissioned 2008.

How GOAT WIND LP compares

With 150 MW of capacity, GOAT WIND LP ranks 159th among the 307 operating power plants Bywatts maps in Texas and 38th of the 94 operating Wind plants in the state. It accounts for about 1.3% of Texas's operating Wind capacity and 0.1% of all operating capacity in the state. Nationally it is the 144th-largest of the 708 operating Wind plants in the database. Commissioned in 2008, it is newer than 68% of the 303 operating Texas plants with a recorded commissioning year. Its operator, EDISON MISSION ENERGY, runs 3 operating plants in Texas totaling 461 MW. It shares Sterling County with 2 other operating plants, CAPRICORN RIDGE WIND LLC and EC&R PANTHER CREEK WIND FARM III.

EIA-860 lists 2 generators at the site with 150 MW of nameplate capacity, all onshore wind turbine technology. Net generation was 223 GWh in 2024 (a 17% capacity factor), down 5% from 2022. Its generators came online between 2008 and 2009.

Grid neighborhood

The nearest named substation is DOWNTOWN, about 22.4 miles away; the closest transmission line found within 10 miles is a 345 kV line owned by CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC, about 0.3 miles away. Another 6 operating power plants totaling 4,844 MW sit within 25 miles; the largest is W A PARISH (4,008 MW, Coal). Within 50 miles are 4 mapped data centers; the nearest is Databank Houston Galleria (HOU5) in Houston, about 17.9 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

GOAT WIND LP is a 150 MW wind power plant in Sterling County, TX, operated by EDISON MISSION ENERGY, commissioned in 2008. Sterling County carries critical modeled catastrophe exposure in the FEMA National Risk Index, scoring 4.5 of 5 at the 89th national percentile. Strong wind is the leading peril, rated Very Low by FEMA at the 96th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a wind plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

4.5 of 5Modeled catastrophe exposure
CriticalExposure band
Strong windLeading peril
Very LowFEMA county risk rating

Sterling County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Strong windVery Low96th4.8 of 51.7
WildfireRelatively Low92nd4.7 of 50.01
LightningVery Low92nd4.7 of 546.6
HailVery Low90th4.6 of 54.3
Heat waveVery Low51st3.0 of 59.2
TornadoVery Low49th3.0 of 50.48
HurricaneVery Low33rd2.3 of 5<0.01
Winter weatherVery Low12th1.5 of 55.0
Riverine floodingVery Low11th1.4 of 50.43
EarthquakeVery Low8th1.3 of 5<0.01
Ice stormVery Low7th1.3 of 50.14

Perils not assessed in Sterling County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Sterling County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.