ELIZABETH RIVER POWER STATION
OperatingNatural Gas power plant
- Capacity
- 389 MW
- Primary fuel
- Natural Gas
- County
- Chesapeake city
- Operator
- VIRGINIA ELECTRIC & POWER CO
- Status
- Operating
- Commissioned
- 1992
- EIA plant ID
- 52087
- Generators
- 3
- Technology
- Natural Gas Fired Combustion Turbine
- Net generation (2024)
- 29.5 GWh
- Capacity factor (2024, EIA nameplate)
- 0.9%
- Data vintage
- EIA-860 2024 final; EIA-923 2022-2024 final
- Coordinates
- 36.7743, -76.3119
ELIZABETH RIVER POWER STATION, a 389 MW Natural Gas power plant in Chesapeake city, Virginia. Operated by VIRGINIA ELECTRIC & POWER CO, commissioned 1992.
How ELIZABETH RIVER POWER STATION compares
With 389 MW of capacity, ELIZABETH RIVER POWER STATION ranks 19th among the 103 operating power plants Bywatts maps in Virginia and 10th of the 15 operating Natural Gas plants in the state. It accounts for about 5.3% of Virginia's operating Natural Gas capacity and 2.0% of all operating capacity in the state. Nationally it is the 382nd-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1992, it is newer than 49% of the 101 operating Virginia plants with a recorded commissioning year. Its operator, VIRGINIA ELECTRIC & POWER CO, runs 21 operating plants in Virginia totaling 12,655 MW.
EIA-860 lists 3 generators at the site with 389 MW of nameplate capacity, all natural gas fired combustion turbine technology. Net generation was 29.5 GWh in 2024 (a 0.9% capacity factor).
Grid neighborhood
The nearest named substation is CHESAPEAKE ENERGY CENTER (500 kV), about 0.6 miles away; the closest transmission line found within 10 miles is a 230 kV line owned by VIRGINIA ELECTRIC & POWER CO, under 0.1 miles away. One other operating power plant sits within 25 miles: WASTE MANAGEMENT BETHEL LFGTE (5 MW, Biomass).
Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology
Weather peril exposure
ELIZABETH RIVER POWER STATION is a 389 MW natural gas power plant in Chesapeake city, VA, operated by VIRGINIA ELECTRIC & POWER CO, commissioned in 1992. Chesapeake city carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.6 of 5 at the 40th national percentile. Hurricane is the leading peril, rated Relatively Moderate by FEMA at the 86th percentile.
The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.
Chesapeake city hazard ratings
| Peril | FEMA rating | National percentile | Peril score | Events per year |
|---|---|---|---|---|
| Hurricane | Relatively Moderate | 86th | 4.5 of 5 | 0.24 |
| Coastal flooding | Relatively Moderate | 68th | 3.7 of 5 | 3.6 |
| Earthquake | Relatively Low | 40th | 2.6 of 5 | <0.01 |
| Wildfire | Relatively Low | 37th | 2.5 of 5 | <0.01 |
| Hail | Relatively Low | 36th | 2.4 of 5 | 1.4 |
| Lightning | Relatively Low | 32nd | 2.3 of 5 | 42.3 |
| Tornado | Relatively Moderate | 26th | 2.0 of 5 | 0.16 |
| Riverine flooding | Relatively Moderate | 24th | 2.0 of 5 | 1.3 |
| Ice storm | Relatively Low | 16th | 1.7 of 5 | 0.88 |
| Heat wave | Relatively Moderate | 15th | 1.6 of 5 | 6.9 |
| Winter weather | Relatively Low | 12th | 1.5 of 5 | 3.4 |
| Strong wind | Very Low | 1st | 1.1 of 5 | 0.55 |
Model hail, wind and flood exposure for Chesapeake city in the weather risk calculator
Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.
Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.