BIG HORN WIND PROJECT

Operating

Wind power plant

Capacity
199 MW
Primary fuel
Wind
County
Klickitat County
Operator
IBERDROLA RENEWABLES INC
Status
Operating
Commissioned
2006
EIA plant ID
56361
Generators
1
Technology
Onshore Wind Turbine
Net generation (2024)
496 GWh
Capacity factor (2024, EIA nameplate)
28%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
45.9014, -120.2885

See it on the map

BIG HORN WIND PROJECT, a 199 MW Wind power plant in Klickitat County, Washington. Operated by IBERDROLA RENEWABLES INC, commissioned 2006.

How BIG HORN WIND PROJECT compares

With 199 MW of capacity, BIG HORN WIND PROJECT ranks 32nd among the 126 operating power plants Bywatts maps in Washington and 6th of the 20 operating Wind plants in the state. It accounts for about 7.1% of Washington's operating Wind capacity and 0.7% of all operating capacity in the state. Nationally it is the 77th-largest of the 708 operating Wind plants in the database. Commissioned in 2006, it is newer than 77% of the 125 operating Washington plants with a recorded commissioning year. Its operator, IBERDROLA RENEWABLES INC, runs 3 operating plants in Washington totaling 400 MW. It shares Klickitat County with 9 other operating plants, including GOLDENDALE GENERATING STATION and WINDY FLATS WIND PROJECT.

EIA-860 lists 1 generator at the site with 199 MW of nameplate capacity, all onshore wind turbine technology. Net generation was 496 GWh in 2024 (a 28% capacity factor), up 6% from 2022.

Grid neighborhood

The nearest named substation is BIG HORN (230 kV), about 0.7 miles away; the closest transmission line found within 10 miles is a 230 kV line owned by BONNEVILLE POWER ADMINISTRATION, under 0.1 miles away. Another 19 operating power plants totaling 4,599 MW sit within 25 miles; the largest is JOHN DAY (2,160 MW, Hydro).

Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

BIG HORN WIND PROJECT is a 199 MW wind power plant in Klickitat County, WA, operated by IBERDROLA RENEWABLES INC, commissioned in 2006. Klickitat County carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.4 of 5 at the 36th national percentile. Wildfire is the leading peril, rated Relatively High by FEMA at the 100th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a wind plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.4 of 5Modeled catastrophe exposure
ModerateExposure band
WildfireLeading peril
Relatively LowFEMA county risk rating

Klickitat County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
WildfireRelatively High100th5.0 of 50.02
Riverine floodingRelatively Low89th4.5 of 50.25
EarthquakeRelatively Low84th4.4 of 50.01
Heat waveRelatively Low63rd3.5 of 54.1
Strong windRelatively Low32nd2.3 of 50.13
HailVery Low18th1.7 of 50.14
Ice stormRelatively High12th1.5 of 50.21
Winter weatherRelatively Moderate11th1.4 of 515.2
LightningRelatively Low9th1.4 of 57.7
TornadoVery Low5th1.2 of 50.05

Perils not assessed in Klickitat County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
HurricaneFEMA rating is "Not Applicable" for this county
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Klickitat County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.