LOWER SNAKE RIVER WIND ENERGY PROJECT

Operating

Wind power plant

Capacity
342 MW
Primary fuel
Wind
County
Garfield County
Operator
PUGET SOUND ENERGY INC
Status
Operating
Commissioned
2012
EIA plant ID
57195
Generators
1
Technology
Onshore Wind Turbine
Net generation (2024)
865 GWh
Capacity factor (2024, EIA nameplate)
29%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
46.5464, -117.8231

See it on the map

LOWER SNAKE RIVER WIND ENERGY PROJECT, a 342 MW Wind power plant in Garfield County, Washington. Operated by PUGET SOUND ENERGY INC, commissioned 2012.

How LOWER SNAKE RIVER WIND ENERGY PROJECT compares

With 342 MW of capacity, LOWER SNAKE RIVER WIND ENERGY PROJECT ranks 19th among the 126 operating power plants Bywatts maps in Washington and is the largest of the 20 operating Wind plants in the state. It accounts for about 12% of Washington's operating Wind capacity and 1.1% of all operating capacity in the state. Nationally it is the 7th-largest of the 708 operating Wind plants in the database. Commissioned in 2012, it is newer than 96% of the 125 operating Washington plants with a recorded commissioning year. Its operator, PUGET SOUND ENERGY INC, runs 17 operating plants in Washington totaling 2,943 MW.

EIA-860 lists 1 generator at the site with 343 MW of nameplate capacity, all onshore wind turbine technology. Net generation was 865 GWh in 2024 (a 29% capacity factor), up 14% from 2022.

Grid neighborhood

The nearest named substation is PHALEN GULCH, about 1.7 miles away; the closest transmission line found within 10 miles is a 500 kV line owned by BONNEVILLE POWER ADMINISTRATION, under 0.1 miles away. Another 4 operating power plants totaling 1,988 MW sit within 25 miles; the largest is LITTLE GOOSE (810 MW, Hydro).

Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

LOWER SNAKE RIVER WIND ENERGY PROJECT is a 342 MW wind power plant in Garfield County, WA, operated by PUGET SOUND ENERGY INC, commissioned in 2012. Garfield County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.4 of 5 at the 10th national percentile. Riverine flooding is the leading peril, rated Very Low by FEMA at the 97th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a wind plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.4 of 5Modeled catastrophe exposure
LowExposure band
Riverine floodingLeading peril
Very LowFEMA county risk rating

Garfield County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Riverine floodingVery Low97th4.9 of 50.14
WildfireRelatively Low92nd4.7 of 5<0.01
Heat waveVery Low63rd3.5 of 54.2
EarthquakeVery Low57th3.3 of 5<0.01
Strong windVery Low19th1.8 of 50.22
Ice stormVery Low14th1.5 of 50.22
HailVery Low9th1.4 of 50.36
Winter weatherVery Low5th1.2 of 510.8
TornadoVery Low5th1.2 of 50.02
LightningVery Low5th1.2 of 514.3

Perils not assessed in Garfield County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
HurricaneFEMA rating is "Not Applicable" for this county
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Garfield County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.