GLACIER HILLS

Operating

Wind power plant

Capacity
162 MW
Primary fuel
Wind
County
Columbia County
Operator
WISCONSIN ELECTRIC POWER CO
Status
Operating
Commissioned
2011
EIA plant ID
57199
Generators
1
Technology
Onshore Wind Turbine
Net generation (2024)
372 GWh
Capacity factor (2024, EIA nameplate)
26%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
43.5650, -89.1506

See it on the map

GLACIER HILLS, a 162 MW Wind power plant in Columbia County, Wisconsin. Operated by WISCONSIN ELECTRIC POWER CO, commissioned 2011.

How GLACIER HILLS compares

With 162 MW of capacity, GLACIER HILLS ranks 24th among the 141 operating power plants Bywatts maps in Wisconsin and is the largest of the 10 operating Wind plants in the state. It accounts for about 26% of Wisconsin's operating Wind capacity and 1.0% of all operating capacity in the state. Nationally it is the 99th-largest of the 708 operating Wind plants in the database. Commissioned in 2011, it is newer than 94% of the 141 operating Wisconsin plants with a recorded commissioning year. Its operator, WISCONSIN ELECTRIC POWER CO, runs 13 operating plants in Wisconsin totaling 5,238 MW. It shares Columbia County with 2 other operating plants, COLUMBIA and KILBOURN.

EIA-860 lists 1 generator at the site with 162 MW of nameplate capacity, all onshore wind turbine technology. Net generation was 372 GWh in 2024 (a 26% capacity factor), down 9% from 2022.

Grid neighborhood

The nearest named substation is ACEC CAMBRIA (138 kV), about 0.1 miles away; the closest transmission line found within 10 miles is a 138 kV line, under 0.1 miles away. Another 2 operating power plants totaling 1,027 MW sit within 25 miles; the largest is COLUMBIA (1,023 MW, Coal). Within 50 miles are 4 mapped data centers; the nearest is Network 222 in Madison, about 36.0 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

GLACIER HILLS is a 162 MW wind power plant in Columbia County, WI, operated by WISCONSIN ELECTRIC POWER CO, commissioned in 2011. Columbia County carries critical modeled catastrophe exposure in the FEMA National Risk Index, scoring 5.0 of 5 at the 99th national percentile. Hail is the leading peril, rated Very High by FEMA at the 100th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a wind plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

5.0 of 5Modeled catastrophe exposure
CriticalExposure band
HailLeading peril
Relatively ModerateFEMA county risk rating

Columbia County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
HailVery High100th5.0 of 53.6
Riverine floodingRelatively Moderate71st3.8 of 52.0
LightningRelatively Low70th3.8 of 535.5
Strong windRelatively Moderate57th3.3 of 53.8
TornadoRelatively Moderate54th3.2 of 50.58
Heat waveRelatively Moderate51st3.0 of 52.8
WildfireVery Low39th2.6 of 5<0.01
EarthquakeVery Low14th1.6 of 5<0.01
Ice stormRelatively Low6th1.2 of 50.43
Winter weatherRelatively Low5th1.2 of 515.5
HurricaneVery Low1st1.0 of 5<0.01

Perils not assessed in Columbia County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Columbia County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.