RIVERSIDE ENERGY CENTER

Operating

Natural Gas power plant

Capacity
696 MW
Primary fuel
Natural Gas
County
Rock County
Operator
ROCK RIVER ENERGY LLC
Status
Operating
Commissioned
2004
EIA plant ID
55641
Generators
3
Technology
Natural Gas Fired Combined Cycle
Net generation (2024)
3,386 GWh
Capacity factor (2024, EIA nameplate)
57%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
42.5827, -89.0355

See it on the map

RIVERSIDE ENERGY CENTER, a 696 MW Natural Gas power plant in Rock County, Wisconsin. Operated by ROCK RIVER ENERGY LLC, commissioned 2004.

How RIVERSIDE ENERGY CENTER compares

With 696 MW of capacity, RIVERSIDE ENERGY CENTER ranks 8th among the 141 operating power plants Bywatts maps in Wisconsin and 2nd of the 26 operating Natural Gas plants in the state. It accounts for about 11% of Wisconsin's operating Natural Gas capacity and 4.3% of all operating capacity in the state. Nationally it is the 191st-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 2004, it is newer than 83% of the 141 operating Wisconsin plants with a recorded commissioning year. It shares Rock County with one other operating plant, AMERESCO JANESVILLE.

EIA-860 lists 3 generators at the site with 675 MW of nameplate capacity, all natural gas fired combined cycle technology. Net generation was 3,386 GWh in 2024 (a 57% capacity factor), up 23% from 2022.

Grid neighborhood

The nearest named substation is NORTHWEST BELOIT (138 kV), about 4.1 miles away; the closest transmission line found within 10 miles is a 138 kV line, under 0.1 miles away. Another 6 operating power plants totaling 776 MW sit within 25 miles; the largest is NRG ROCKFORD I (316 MW, Natural Gas). Within 50 miles are 4 mapped data centers; the nearest is Network 222 in Madison, about 38.3 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

RIVERSIDE ENERGY CENTER is a 696 MW natural gas power plant in Rock County, WI, operated by ROCK RIVER ENERGY LLC, commissioned in 2004. Rock County carries high modeled catastrophe exposure in the FEMA National Risk Index, scoring 4.1 of 5 at the 77th national percentile. Lightning is the leading peril, rated Relatively High by FEMA at the 97th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

4.1 of 5Modeled catastrophe exposure
HighExposure band
LightningLeading peril
Relatively ModerateFEMA county risk rating

Rock County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
LightningRelatively High97th4.9 of 538.5
HailRelatively High81st4.2 of 54.3
TornadoRelatively High73rd3.9 of 50.58
Riverine floodingRelatively Moderate61st3.4 of 52.1
Heat waveRelatively Moderate56th3.3 of 53.6
Strong windRelatively High50th3.0 of 55.5
EarthquakeVery Low31st2.2 of 5<0.01
WildfireVery Low23rd1.9 of 5<0.01
Ice stormRelatively Low13th1.5 of 50.63
Winter weatherRelatively Moderate3rd1.1 of 514.1
HurricaneVery Low1st1.1 of 5<0.01

Perils not assessed in Rock County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Rock County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.