WESTBROOK ENERGY CENTER POWER PLANT
OperatingNatural Gas power plant
- Capacity
- 564 MW
- Primary fuel
- Natural Gas
- County
- Cumberland County
- Operator
- WESTBROOK ENERGY CENTER
- Status
- Operating
- Commissioned
- 2001
- EIA plant ID
- 55294
- Generators
- 3
- Technology
- Natural Gas Fired Combined Cycle
- Net generation (2024)
- 3,022 GWh
- Capacity factor (2024, EIA nameplate)
- 61%
- Data vintage
- EIA-860 2024 final; EIA-923 2022-2024 final
- Coordinates
- 43.6575, -70.3772
WESTBROOK ENERGY CENTER POWER PLANT, a 564 MW Natural Gas power plant in Cumberland County, Maine. Operated by WESTBROOK ENERGY CENTER, commissioned 2001.
How WESTBROOK ENERGY CENTER POWER PLANT compares
With 564 MW of capacity, WESTBROOK ENERGY CENTER POWER PLANT ranks 2nd among the 83 operating power plants Bywatts maps in Maine and is the largest of the 5 operating Natural Gas plants in the state. It accounts for about 30% of Maine's operating Natural Gas capacity and 13% of all operating capacity in the state. Nationally it is the 289th-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 2001, it is newer than 79% of the 81 operating Maine plants with a recorded commissioning year. It shares Cumberland County with 7 other operating plants, including WILLIAM F WYMAN and S D WARREN WESTBROOK.
EIA-860 lists 3 generators at the site with 564 MW of nameplate capacity, all natural gas fired combined cycle technology. Net generation was 3,022 GWh in 2024 (a 61% capacity factor), up 23% from 2022.
Grid neighborhood
The nearest named substation is SOUTH GORHAM (345 kV), about 2.9 miles away; the closest transmission line found within 10 miles is a 115 kV line owned by CENTRAL MAINE POWER CO, under 0.1 miles away. Another 10 operating power plants totaling 1,016 MW sit within 25 miles; the largest is WILLIAM F WYMAN (846 MW, Oil).
Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology
Weather peril exposure
WESTBROOK ENERGY CENTER POWER PLANT is a 564 MW natural gas power plant in Cumberland County, ME, operated by WESTBROOK ENERGY CENTER, commissioned in 2001. Cumberland County carries elevated modeled catastrophe exposure in the FEMA National Risk Index, scoring 3.1 of 5 at the 53rd national percentile. Coastal flooding is the leading peril, rated Relatively Moderate by FEMA at the 93rd percentile.
The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.
Cumberland County hazard ratings
| Peril | FEMA rating | National percentile | Peril score | Events per year |
|---|---|---|---|---|
| Coastal flooding | Relatively Moderate | 93rd | 4.7 of 5 | 8.2 |
| Ice storm | Very High | 91st | 4.7 of 5 | 1.8 |
| Hurricane | Relatively Moderate | 84th | 4.4 of 5 | 0.12 |
| Winter weather | Very High | 76th | 4.0 of 5 | 26.5 |
| Earthquake | Relatively Low | 63rd | 3.5 of 5 | <0.01 |
| Lightning | Relatively High | 53rd | 3.1 of 5 | 18.1 |
| Hail | Relatively Moderate | 45th | 2.8 of 5 | 1.4 |
| Wildfire | Very Low | 8th | 1.3 of 5 | <0.01 |
| Strong wind | Relatively Moderate | 7th | 1.3 of 5 | 0.39 |
| Heat wave | Relatively Low | 6th | 1.2 of 5 | 3.3 |
| Riverine flooding | Relatively Low | 4th | 1.2 of 5 | 2.0 |
| Tornado | Very Low | 2nd | 1.1 of 5 | 0.10 |
Model hail, wind and flood exposure for Cumberland County in the weather risk calculator
Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.
Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.