SALEM HARBOR

Operating

Coal power plant

Capacity
805 MW
Primary fuel
Coal
County
Essex County
Operator
NAES SALEM HARBOR
Status
Operating
EIA plant ID
1626
Coordinates
42.5261, -70.8759

See it on the map

SALEM HARBOR, an 805 MW Coal power plant in Essex County, Massachusetts. Operated by NAES SALEM HARBOR.

Weather peril exposure

SALEM HARBOR is an 805 MW coal power plant in Essex County, MA, operated by NAES SALEM HARBOR. Essex County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.7 of 5 at the 17th national percentile. Coastal flooding is the leading peril, rated Very High by FEMA at the 88th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a coal plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.7 of 5Modeled catastrophe exposure
LowExposure band
Coastal floodingLeading peril
Relatively HighFEMA county risk rating

Essex County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Coastal floodingVery High88th4.5 of 58.1
HurricaneRelatively High76th4.0 of 50.17
EarthquakeRelatively Moderate75th4.0 of 5<0.01
Ice stormVery High68th3.7 of 51.5
Riverine floodingRelatively High38th2.5 of 52.7
WildfireVery Low27th2.1 of 5<0.01
TornadoRelatively High23rd1.9 of 50.12
Strong windRelatively High13th1.5 of 50.75
LightningRelatively High11th1.4 of 519.4
Winter weatherRelatively Low10th1.4 of 515.1
Heat waveRelatively Moderate7th1.3 of 55.1
HailVery Low4th1.1 of 51.8

Model hail, wind and flood exposure for Essex County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.