PSEG HOPE CREEK GENERATING STATION

Operating

Nuclear power plant

Capacity
1,291 MW
Primary fuel
Nuclear
County
Salem County
Operator
PSEG NUCLEAR LLC
Status
Operating
Commissioned
1986
EIA plant ID
6118
Generators
1
Technology
Nuclear
Net generation (2024)
8,966 GWh
Capacity factor (2024, EIA nameplate)
79%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
39.4666, -75.5374

See it on the map

PSEG HOPE CREEK GENERATING STATION, a 1,291 MW Nuclear power plant in Salem County, New Jersey. Operated by PSEG NUCLEAR LLC, commissioned 1986.

How PSEG HOPE CREEK GENERATING STATION compares

With 1,291 MW of capacity, PSEG HOPE CREEK GENERATING STATION ranks 4th among the 130 operating power plants Bywatts maps in New Jersey and is the smallest of the 2 operating Nuclear plants in the state. It accounts for about 35% of New Jersey's operating Nuclear capacity and 8.8% of all operating capacity in the state. Nationally it is the 35th-largest of the 55 operating Nuclear plants in the database. Commissioned in 1986, it is older than 89% of the 128 operating New Jersey plants with a recorded commissioning year. Its operator, PSEG NUCLEAR LLC, runs 2 operating plants in New Jersey totaling 3,673 MW. It shares Salem County with 2 other operating plants, PSEG SALEM GENERATING STATION and PILESGROVE.

EIA-860 lists 1 generator at the site with 1,291 MW of nameplate capacity, all nuclear technology. Net generation was 8,966 GWh in 2024 (a 79% capacity factor), down 3% from 2022.

Grid neighborhood

The nearest named substation is CLAYMONT (230 kV), about 23.6 miles away; the closest transmission line found within 10 miles is a 500 kV line owned by ATLANTIC CITY ELECTRIC CO, under 0.1 miles away. Another 19 operating power plants totaling 5,853 MW sit within 25 miles; the largest is PSEG SALEM GENERATING STATION (2,382 MW, Nuclear). Within 50 miles are 4 mapped data centers; the nearest is USNAMES-NET in Wilmington, about 18.9 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

PSEG HOPE CREEK GENERATING STATION is a 1,291 MW nuclear power plant in Salem County, NJ, operated by PSEG NUCLEAR LLC, commissioned in 1986. Salem County carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.3 of 5 at the 33rd national percentile. Coastal flooding is the leading peril, rated Very High by FEMA at the 95th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a nuclear plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.3 of 5Modeled catastrophe exposure
ModerateExposure band
Coastal floodingLeading peril
Relatively LowFEMA county risk rating

Salem County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Coastal floodingVery High95th4.8 of 53.7
Strong windRelatively High89th4.6 of 56.2
EarthquakeRelatively Low76th4.0 of 5<0.01
Winter weatherRelatively Moderate68th3.7 of 510.5
HurricaneRelatively Low68th3.7 of 50.10
WildfireRelatively Low59th3.4 of 5<0.01
Ice stormRelatively High43rd2.7 of 51.1
Riverine floodingRelatively Low34th2.4 of 51.5
TornadoRelatively Low23rd1.9 of 50.18
LightningRelatively Low20th1.8 of 534.5
HailRelatively Low9th1.4 of 52.2
Heat waveRelatively Low3rd1.1 of 55.8

Model hail, wind and flood exposure for Salem County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.