RED OAK POWER LLC

Operating

Natural Gas power plant

Capacity
966 MW
Primary fuel
Natural Gas
County
Middlesex County
Operator
RED OAK POWER LLC
Status
Operating
Commissioned
2002
EIA plant ID
55239
Generators
4
Technology
Natural Gas Fired Combined Cycle
Net generation (2024)
3,249 GWh
Capacity factor (2024, EIA nameplate)
45%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
40.4488, -74.3485

See it on the map

RED OAK POWER LLC, a 966 MW Natural Gas power plant in Middlesex County, New Jersey. Operated by RED OAK POWER LLC, commissioned 2002.

How RED OAK POWER LLC compares

With 966 MW of capacity, RED OAK POWER LLC ranks 6th among the 130 operating power plants Bywatts maps in New Jersey and 4th of the 25 operating Natural Gas plants in the state. It accounts for about 11% of New Jersey's operating Natural Gas capacity and 6.6% of all operating capacity in the state. Nationally it is the 102nd-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 2002, it is older than 71% of the 128 operating New Jersey plants with a recorded commissioning year. It shares Middlesex County with 29 other operating plants, including PSEG SEWAREN GENERATING STATION and SAYREVILLE COGENERATION FACILITY.

EIA-860 lists 4 generators at the site with 821 MW of nameplate capacity, all natural gas fired combined cycle technology (this page's HIFLD capacity figure is 966 MW). Net generation was 3,249 GWh in 2024 (a 45% capacity factor), up 4% from 2022.

Grid neighborhood

The nearest named substation is SAYREVILLE (500 kV), about 1.8 miles away; the closest transmission line found within 10 miles is a 230 kV line owned by JERSEY CENTRAL POWER & LT CO, under 0.1 miles away. Another 56 operating power plants totaling 7,436 MW sit within 25 miles; the largest is PSEG LINDEN GENERATING STATION (1,759 MW, Natural Gas). Within 50 miles are 29 mapped data centers; the nearest is QTS Piscataway (PNJ1) in Piscataway, about 10.3 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

RED OAK POWER LLC is a 966 MW natural gas power plant in Middlesex County, NJ, operated by RED OAK POWER LLC, commissioned in 2002. Middlesex County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.6 of 5 at the 14th national percentile. Strong wind is the leading peril, rated Very High by FEMA at the 83rd percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.6 of 5Modeled catastrophe exposure
LowExposure band
Strong windLeading peril
Relatively HighFEMA county risk rating

Middlesex County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Strong windVery High83rd4.3 of 56.9
EarthquakeRelatively Moderate77th4.1 of 5<0.01
Ice stormVery High72nd3.9 of 51.0
HurricaneRelatively Moderate70th3.8 of 50.11
Riverine floodingRelatively High66th3.6 of 53.2
Coastal floodingRelatively High64th3.6 of 53.8
WildfireRelatively Low50th3.0 of 5<0.01
Winter weatherVery High46th2.9 of 510.6
TornadoRelatively High25th2.0 of 50.12
HailRelatively Low8th1.3 of 52.4
LightningRelatively Moderate8th1.3 of 533.6
Heat waveRelatively Moderate1st1.1 of 57.5

Model hail, wind and flood exposure for Middlesex County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.