BIGLOW CANYON WIND FARM

Operating

Wind power plant

Capacity
450 MW
Primary fuel
Wind
County
Sherman County
Operator
PORTLAND GENERAL ELECTRIC CO
Status
Operating
Commissioned
2007
EIA plant ID
56485
Generators
3
Technology
Onshore Wind Turbine
Net generation (2024)
1,006 GWh
Capacity factor (2024, EIA nameplate)
25%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
45.6514, -120.6039

See it on the map

BIGLOW CANYON WIND FARM, a 450 MW Wind power plant in Sherman County, Oregon. Operated by PORTLAND GENERAL ELECTRIC CO, commissioned 2007.

How BIGLOW CANYON WIND FARM compares

With 450 MW of capacity, BIGLOW CANYON WIND FARM ranks 10th among the 130 operating power plants Bywatts maps in Oregon and is the largest of the 33 operating Wind plants in the state. It accounts for about 16% of Oregon's operating Wind capacity and 3.0% of all operating capacity in the state. Nationally it is the 5th-largest of the 708 operating Wind plants in the database. Commissioned in 2007, it is newer than 63% of the 128 operating Oregon plants with a recorded commissioning year. Its operator, PORTLAND GENERAL ELECTRIC CO, runs 14 operating plants in Oregon totaling 2,366 MW. It shares Sherman County with 8 other operating plants, including JOHN DAY and HAY CANYON WIND POWER LLC.

EIA-860 lists 3 generators at the site with 450 MW of nameplate capacity, all onshore wind turbine technology. Net generation was 1,006 GWh in 2024 (a 25% capacity factor), up 31% from 2022. Its generators came online between 2007 and 2010.

Grid neighborhood

The nearest named substation is BIGLOW CANYON (230 kV), about 0.4 miles away; the closest transmission line found within 10 miles is a 230 kV line owned by BONNEVILLE POWER ADMINISTRATION, under 0.1 miles away. Another 22 operating power plants totaling 4,615 MW sit within 25 miles; the largest is JOHN DAY (2,160 MW, Hydro).

Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

BIGLOW CANYON WIND FARM is a 450 MW wind power plant in Sherman County, OR, operated by PORTLAND GENERAL ELECTRIC CO, commissioned in 2007. Sherman County carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.0 of 5 at the 24th national percentile. Wildfire is the leading peril, rated Relatively Moderate by FEMA at the 99th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a wind plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.0 of 5Modeled catastrophe exposure
ModerateExposure band
WildfireLeading peril
Very LowFEMA county risk rating

Sherman County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
WildfireRelatively Moderate99th5.0 of 50.01
EarthquakeVery Low79th4.1 of 5<0.01
Heat waveVery Low61st3.4 of 53.8
Riverine floodingVery Low39th2.6 of 50.04
Strong windVery Low33rd2.3 of 50.12
HailVery Low23rd1.9 of 50.22
LightningVery Low9th1.4 of 57.3
Winter weatherVery Low9th1.4 of 511.3
Ice stormRelatively Low7th1.3 of 50.10
TornadoVery Low3rd1.1 of 50.01

Perils not assessed in Sherman County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
HurricaneFEMA rating is "Not Applicable" for this county
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Sherman County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.