THE DALLES

Operating

Hydro power plant

Capacity
1,820 MW
Primary fuel
Hydro
County
Wasco County
Operator
USACE NORTHWESTERN DIVISION
Status
Operating
Commissioned
1957
EIA plant ID
3895
Generators
24
Technology
Conventional Hydroelectric
Net generation (2024)
5,431 GWh
Capacity factor (2024, EIA nameplate)
34%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
45.6176, -121.1240

See it on the map

THE DALLES, a 1,820 MW Hydro power plant in Wasco County, Oregon. Operated by USACE NORTHWESTERN DIVISION, commissioned 1957.

How THE DALLES compares

With 1,820 MW of capacity, THE DALLES ranks 2nd among the 130 operating power plants Bywatts maps in Oregon and 2nd of the 58 operating Hydro plants in the state. It accounts for about 22% of Oregon's operating Hydro capacity and 12% of all operating capacity in the state. Nationally it is the 7th-largest of the 1,243 operating Hydro plants in the database. Commissioned in 1957, it is older than 75% of the 128 operating Oregon plants with a recorded commissioning year. Its operator, USACE NORTHWESTERN DIVISION, runs 13 operating plants in Oregon totaling 6,521 MW. It shares Wasco County with one other operating plant, DALLES DAM NORTH FISHWAY PROJECT.

EIA-860 lists 24 generators at the site with 1,820 MW of nameplate capacity, all conventional hydroelectric technology. Net generation was 5,431 GWh in 2024 (a 34% capacity factor), down 19% from 2022. Its generators came online between 1957 and 1973.

Grid neighborhood

The nearest named substation is SPEARFISH (115 kV), about 0.7 miles away; the closest transmission line found within 10 miles is a 230 kV line owned by BONNEVILLE POWER ADMINISTRATION, under 0.1 miles away. Another 8 operating power plants totaling 2,773 MW sit within 25 miles; the largest is JOHN DAY (2,160 MW, Hydro).

Computed by Bywatts from HIFLD power plant, substation and transmission line records and EIA-860/923 survey data; distances are straight-line. Sources and methodology

Weather peril exposure

THE DALLES is a 1,820 MW hydro power plant in Wasco County, OR, operated by USACE NORTHWESTERN DIVISION, commissioned in 1957. Wasco County carries moderate modeled catastrophe exposure in the FEMA National Risk Index, scoring 2.2 of 5 at the 31st national percentile. Wildfire is the leading peril, rated Relatively High by FEMA at the 99th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a hydro plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

2.2 of 5Modeled catastrophe exposure
ModerateExposure band
WildfireLeading peril
Relatively LowFEMA county risk rating

Wasco County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
WildfireRelatively High99th5.0 of 50.02
EarthquakeRelatively Low88th4.5 of 5<0.01
Riverine floodingRelatively Low79th4.2 of 50.11
Heat waveRelatively Low64th3.6 of 53.5
Strong windVery Low34th2.4 of 50.10
HailVery Low22nd1.9 of 50.25
Ice stormRelatively High16th1.6 of 50.25
Winter weatherRelatively Low9th1.3 of 513.3
LightningRelatively Low7th1.3 of 58.0
TornadoVery Low4th1.2 of 50.06

Perils not assessed in Wasco County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
HurricaneFEMA rating is "Not Applicable" for this county
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Wasco County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.