CALDERWOOD

Operating

Hydro power plant

Capacity
157 MW
Primary fuel
Hydro
County
Blount County
Operator
BROOKFIELD RENEWABLE POWER
Status
Operating
Commissioned
1930
EIA plant ID
54900
Generators
3
Technology
Conventional Hydroelectric
Net generation (2024)
549 GWh
Capacity factor (2024, EIA nameplate)
40%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
35.4940, -83.9888

See it on the map

CALDERWOOD, a 157 MW Hydro power plant in Blount County, Tennessee. Operated by BROOKFIELD RENEWABLE POWER, commissioned 1930.

How CALDERWOOD compares

With 157 MW of capacity, CALDERWOOD ranks 16th among the 53 operating power plants Bywatts maps in Tennessee and 5th of the 29 operating Hydro plants in the state. It accounts for about 3.7% of Tennessee's operating Hydro capacity and 0.8% of all operating capacity in the state. Nationally it is the 120th-largest of the 1,243 operating Hydro plants in the database. Commissioned in 1930, it is older than 90% of the 53 operating Tennessee plants with a recorded commissioning year. Its operator, BROOKFIELD RENEWABLE POWER, runs 2 operating plants in Tennessee totaling 206 MW. It shares Blount County with one other operating plant, CHILHOWEE.

EIA-860 lists 3 generators at the site with 157 MW of nameplate capacity, all conventional hydroelectric technology. Net generation was 549 GWh in 2024 (a 40% capacity factor), down 11% from 2022. Its generators came online between 1930 and 1938.

Grid neighborhood

The nearest named substation is CHILHOWEE, about 7.9 miles away; the closest transmission line found within 10 miles is a 161 kV line owned by BROOKFIELD SMOKY MOUNTAIN HYDROPOWER LLC, under 0.1 miles away. Another 6 operating power plants totaling 507 MW sit within 25 miles; the largest is FONTANA DAM (255 MW, Hydro). Within 50 miles is one mapped data center, Peace Communications KNX1 in Knoxville, about 32.8 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

CALDERWOOD is a 157 MW hydro power plant in Blount County, TN, operated by BROOKFIELD RENEWABLE POWER, commissioned in 1930. Blount County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.5 of 5 at the 14th national percentile. Lightning is the leading peril, rated Relatively High by FEMA at the 99th percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a hydro plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.5 of 5Modeled catastrophe exposure
LowExposure band
LightningLeading peril
Relatively LowFEMA county risk rating

Blount County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
LightningRelatively High99th5.0 of 556.7
EarthquakeRelatively Moderate90th4.6 of 5<0.01
WildfireRelatively Low70th3.8 of 5<0.01
Ice stormRelatively Moderate62nd3.5 of 50.33
Winter weatherRelatively Moderate61st3.4 of 58.0
TornadoRelatively Moderate46th2.9 of 50.18
HurricaneVery Low44th2.8 of 50.02
Riverine floodingRelatively Moderate33rd2.3 of 51.0
HailRelatively Low22nd1.9 of 53.1
Strong windRelatively Moderate21st1.8 of 54.6
Heat waveRelatively Low12th1.5 of 50.65

Perils not assessed in Blount County

These perils carry no usable National Risk Index figure for this county, so they are excluded from the scoring rather than scored zero. A zero would claim the peril was assessed and found benign.

PerilWhy it is not scored
Coastal floodingFEMA rating is "Not Applicable" for this county

Model hail, wind and flood exposure for Blount County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.